Zimapán Dam (Spanish: Presa Zimapán), officially known as the Fernando Hiriart Balderrama Dam, is a concrete arch-gravity dam on the Moctezuma River (Río Moctezuma) in the state of Hidalgo, Mexico. It is located near the municipal seat of Zimapán, approximately 180 kilometers north of Mexico City.
Construction and Specifications Construction of the dam began in 1989 and was completed in 1994. The project was developed by the Comisión Federal de Electricidad (CFE), Mexico's state-owned electric utility. The dam stands 203 meters (666 feet) high, making it one of the highest dams in Mexico and the highest arch-gravity dam in the country at the time of its completion. The crest length is approximately 313 meters (1,027 feet), and the structure contains roughly 3.4 million cubic meters of concrete.
Reservoir The dam creates the Zimapán Reservoir (Presa Zimapán), which has a total storage capacity of approximately 1.56 billion cubic meters (1,560,000 acre-feet) and a surface area of roughly 2,900 hectares (7,166 acres) at normal operating level. The reservoir extends upstream along the Moctezuma River and its tributaries, the Tula and San Juan rivers.
Hydroelectric Power Generation The primary purpose of the dam is hydroelectric power generation. The associated power plant, located at the toe of the dam, houses four Francis turbine-generators with a total installed capacity of 292 megawatts (MW). The facility generates an average of approximately 1,100 gigawatt-hours (GWh) of electricity annually, contributing significantly to the central region of the Mexican national grid.
Additional Functions Beyond electricity generation, the reservoir provides water for irrigation in the Mezquital Valley agricultural region downstream, supports flood control for the Moctezuma River basin, and has developed a local fishery (primarily tilapia and carp) and tourism sector.
Geology and Seismicity The dam is founded on a foundation of limestone and shale formations characteristic of the Sierra Madre Oriental. Due to the karstic nature of the limestone, extensive grouting programs were required during construction to seal the foundation and abutments against leakage. The site is located in a region of moderate seismic activity; the dam design incorporates seismic resistance parameters appropriate for the regional hazard assessment.
Environmental and Social Impact The filling of the reservoir necessitated the relocation of communities and the inundation of archaeological sites, agricultural land, and a section of the federal highway (Mexico 85), which was rerouted. Environmental impact assessments were conducted prior to construction, and mitigation measures included reforestation programs and the establishment of a fish hatchery.