The Zanthus train collision occurred on 18 August 1999 at 5:06 pm AWST at a crossing loop on the Trans-Australian Railway near Zanthus, Western Australia. A National Rail freight train and an Indian Pacific passenger train collided, resulting in 21 injuries and no fatalities.
Location
Zanthus is a remote railway siding located approximately 739 kilometres (459 miles) east-northeast of Perth and 202 kilometres (126 miles) east of Kalgoorlie, on the Nullarbor Plain in Western Australia. The collision occurred on the east–west standard-gauge railway line connecting Perth and Sydney.
Incident
An eastbound freight train was waiting at the departure end of the crossing loop for a westbound Indian Pacific passenger train to pass through. The second engineman of the freight train was attending to the points control panel for the opposing train. According to the official investigation, he pressed the button to operate the points at an inappropriate time, and the westbound Indian Pacific was diverted at approximately 40 km/h (25 mph) into the loop, where it could not stop in time to avoid a head-on collision with the stationary freight train. The speed at the point of impact was approximately 27 km/h (17 mph).
At the time of the collision, the Indian Pacific was carrying 181 passengers, 16 Great Southern Railway on-train staff, and 5 train crew members across the two trains.
Injuries and damage
Twenty-one passengers and crew from the Indian Pacific were airlifted by the Royal Flying Doctor Service to Kalgoorlie Hospital from the remote Coonana airstrip, approximately 40 kilometres from the crash site. Only two passengers were admitted for overnight observation. Westrail provided two Prospector railcars to transfer the remaining passengers back to Kalgoorlie.
All nineteen carriages of the Indian Pacific sustained varying degrees of damage, from minor internal damage to the write-off of several carriages. As of March 2007, some abandoned carriages remained at the site. Great Southern Rail estimated the damage to the carriages at approximately A$5 million, while National Rail estimated the damage to the NR-class locomotives NR15 and NR51 at around A$1 million.
Cause and aftermath
The investigation determined that the accident was caused by driver error, specifically the premature operation of the points. The points at the crossing loop were not fully interlocked but were operated as a type of power-assisted hand lever with automatic normalisation, which permitted the inappropriate operation that led to the collision.
Following the accident, the operation of the points at Zanthus and other crossing loops was altered so that the point indicator lights would not operate until the access process was completed, allowing trains time to stop at red point indicator signals. The east–west rail link at Zanthus was closed to train operations until 13:05 hours on 19 August 1999.
Official investigation
An independent investigation was appointed by the Director General of the Western Australian Department of Transport under the Rail Safety Act 1998, and the incident was also investigated by the Australian Transport Safety Bureau (ATSB). The official report was designated Rail Safety Investigation Report 1999/001.