Yellow Line (Bangkok)

The MRT Yellow Line (Thai: รถไฟฟ้ามหานคร สายสีเหลือง), officially named the MRT Nakkhara Phiphat Line (Thai: รถไฟฟ้ามหานคร สายนัคราพิพัฒน์), is an elevated monorail rapid transit line in Bangkok and Samut Prakan Province, Thailand. It is the third line of the MRT (Metropolitan Rapid Transit) system, operated by Eastern Bangkok Monorail Company Limited (EBM), a subsidiary of the BSR Consortium.

Overview

The Yellow Line runs 28.62 kilometers (17.78 miles) with 23 stations, connecting Lat Phrao in northern Bangkok to Samrong in the southeastern suburbs. It provides mass transit along the heavily congested Lat Phrao Road and Srinagarindra Road corridors. The line interchanges with six other transit lines: the MRT Blue Line, the MRT Orange Line (under construction), the planned MRT Grey Line and MRT Brown Line, the Airport Rail Link, and the BTS Sukhumvit Line.

History

The Yellow Line was first proposed in the mid-1990s as a monorail line by Japanese consultants, with little progress for a decade. In 2004, the Office of Transport and Traffic Policy and Planning (OTP) reworked the proposal as a heavy rail line with underground and elevated sections. In 2012, it was decided to build an elevated monorail line for the entire length to reduce construction costs.

In December 2016, the BSR consortium (comprising BTS Group Holdings with a 75% majority stake, Sino-Thai Engineering and Construction, and Ratchaburi Electricity Generation Holding) won the bid to construct and operate the line. The contract was signed on June 16, 2017. Major construction began in March 2018.

After repeated delays, the line partially opened for free trial rides on June 3, 2023, from Hua Mak to Samrong. The Phawana to Hua Mak section opened on June 12, and the final section to Lat Phrao station opened on June 19, 2023. Full commercial service began on July 3, 2023.

On May 30, 2024, His Majesty the King of Thailand bestowed the official name "Nakkhara Phiphat" (from Pali: Nagara Vivaḍḍhana, meaning "prosperity of the city") upon the line.

Route

The line starts at the intersection of Ratchadaphisek and Lat Phrao roads (interchanging with the MRT Blue Line at Lat Phrao station), heads east along Lat Phrao Road to Bang Kapi intersection, then turns south onto Srinagarindra Road. It continues south past Hua Mak (interchanging with the Airport Rail Link) and along Srinagarindra Road to Thepharak Road in Samut Prakan Province, then heads west to terminate at Samrong (interchanging with the BTS Sukhumvit Line).

Stations

The 23 stations (from north to south) are: Lat Phrao (YL01), Phawana (YL02), Chok Chai 4 (YL03), Lat Phrao 71 (YL04), Lat Phrao 83 (YL05), Mahat Thai (YL06), Lat Phrao 101 (YL07), Bang Kapi (YL08), Yaek Lam Sali (YL09), Si Kritha (YL10), Hua Mak (YL11), Kalantan (YL12), Si Nut (YL13), Srinagarindra 38 (YL14), Suan Luang Rama IX (YL15), Si Udom (YL16), Si Iam (YL17), Si La Salle (YL18), Si Bearing (YL19), Si Dan (YL20), Si Thepha (YL21), Thipphawan (YL22), and Samrong (YL23).

Rolling Stock

The line uses Bombardier Innovia Monorail 300 rolling stock (now manufactured by Alstom), consisting of 28 four-car trains. The trains were manufactured by CRRC Puzhen Bombardier Transportation Systems in Wuhu, Anhui, China. The system is fully automated with CITYFLO 650 communications-based train control (CBTC) operating at GoA 4 (fully automated, driverless operation). Trains are rubber-tired, operate on a narrow elevated guideway beam, and reach a maximum speed of 80 km/h (50 mph).

Operation

The Yellow Line operates daily from approximately 6:00 to 24:00. During peak hours (Monday–Friday, 7:00–9:00 and 17:00–20:00), trains run every 5 minutes; during off-peak hours, every 10 minutes. Rabbit Cards and EMV contactless payment cards are accepted.

Ridership

As of 2025, the line carries approximately 45,000–48,000 passengers per day. Annual ridership reached approximately 16.5 million in 2025.

Incidents

On January 2, 2024, a guide wheel from a train fell off between Si Thepha and Si Dan stations, striking a taxi (no injuries). On March 28, 2024, loose bolts caused parts of the conductor rail to fall onto the street between Kalantan and Si Udom stations, suspending service. On March 28, 2025, a 7.7-magnitude earthquake in Myanmar led to a temporary suspension of all train services; normal service resumed on March 30, 2025.

Proposed Extensions

A two-station northern extension from Lat Phrao to link with the BTS Sukhumvit Line at Ratchayothin station has been proposed but was put on hold in 2023 due to lower-than-expected passenger numbers and disputes over revenue compensation. A southern extension across the Chao Phraya River to link with the MRT Purple Line has also been discussed but faces design constraints.