Vienna station is a Washington Metro station in Fairfax County, Virginia. It is the western terminus of the Orange Line. The station is located in the median of Interstate 66 at Nutley Street (Virginia State Route 243), near the town of Vienna and the city of Fairfax, Virginia.
History and Background
The station was identified as the western terminus of the Orange Line in the 1968 plan. After debates over routing through Tysons versus Vienna, the Fairfax County Board of Supervisors endorsed the Vienna routing in 1978. The groundbreaking took place on September 8, 1982, with an estimated cost of $17.6 million and parking for 2,000 vehicles. The station opened on June 7, 1986, coinciding with the completion of 9.1 miles (14.6 km) of rail from Ballston–MU station and the opening of East Falls Church, West Falls Church, and Dunn Loring stations.
Naming
The station originally opened as "Vienna." In March 1999, the name was changed to "Vienna/Fairfax–GMU," though this was considered misleading as a drive or bus ride is required to reach Fairfax City and George Mason University. In November 2011, following new guidelines limiting station names to nineteen characters, the primary name reverted to "Vienna" with "Fairfax–GMU" becoming a secondary name on Metro maps.
Station Details
The station features a single island platform located in the median of I-66, with a mezzanine above containing fare gates and other equipment. Access is via two elevated walkways bridging the eastbound and westbound lanes of I-66 to parking complexes on both the north and south sides. Parking is available with 5,840 spaces. The station is accessible and offers connections to Metrobus, Fairfax Connector, CUE Bus, George Mason University shuttles, and BestBus services.
Services and Operations
- Station code: K08
- Opened: June 7, 1986
- Rebuilt: 2020 (platform reconstruction)
- Daily ridership (2025): 4,277 (ranked 33 out of 98 stations)
- Accessible: Yes
The station was closed from May 23 to September 7, 2020, for platform reconstruction and again from June 3 to July 17, 2023, for track replacement.
Transit-oriented Development
The Fairlee Metro-West project aims to increase housing density around the station from 60 single-family homes to approximately 2,250 condominiums and townhouses. This development has generated controversy, with some Orange Line commuters expressing concern about system capacity during peak hours.