The Unki mine is an underground platinum group metals (PGM) mine located in the central part of Zimbabwe, in the Shurugwi area of Midlands Province. It is situated on the Great Dyke, approximately 60 kilometres south-east of the town of Gweru.
Geology and location
The mine is located in the Selukwe (Shurugwi) subchamber of the Great Dyke, a 2.5-billion-year-old mafic to predominantly ultramafic layered intrusion that extends approximately 550 kilometres in length and ranges from 3 to 11 kilometres in width. The subchamber is about 90 kilometres long and up to 7 kilometres wide. The mine extracts the Main Sulphide Zone (MSZ), a mineralised horizon within the uppermost pyroxenite layer of the ultramafic sequence, which contains platinum group elements and associated base metals such as nickel and copper.
Operations
Unki is a fully mechanised, trackless, bord-and-pillar underground mine. A twin-decline shaft system provides access to the underground workings for personnel, material, and ore conveyance. Run-of-mine ore is processed at an on-site concentrator plant with a capacity of approximately 210,000 tonnes per month. The operation also includes a smelter.
Reserves and production
Unki represents one of the largest platinum reserves in Zimbabwe, with estimated reserves of approximately 34 million ounces (964 tonnes) of platinum. The mine produces platinum, palladium, rhodium, ruthenium, gold, nickel, and copper. In 2025, total PGM production was approximately 219,700 ounces, a decrease of 8% from 240,000 ounces in 2024, attributed to lower-grade ore and reduced plant recovery.
Ownership
The mine is operated by Unki Mines (Private) Limited, which is 100% owned by Valterra Platinum. The operation was previously owned by Anglo American plc before being transferred to Valterra Platinum. In 2025, Unki became the first mine in the IRMA (Initiative for Responsible Mining Assurance) system to undergo an independent Renewal Audit, following initial and surveillance audits conducted under Anglo American ownership.
Recent developments
A 10 MW photovoltaic (PV) solar plant is planned to be commissioned at Unki by mid-2026, as the first phase of a planned 25–30 MW PV installation. The mine reported one fatality in 2025, ending a 13-year period without fatalities.