WIPIVERSE All articles

USS Gettysburg (1858)

USS Gettysburg (1858) was a steamer that served in the United States Navy. It was the first ship of the U.S. Navy to bear the name "Gettysburg," in reference to the Battle of Gettysburg. The vessel had a varied service history, beginning as a civilian mail packet in the United Kingdom, transitioning to a Confederate blockade runner during the American Civil War, and ultimately serving as a Union Navy gunboat.

Construction and Early Service (1858–1862)

The ship was built by Robert Napier and Sons in Glasgow, Scotland, in 1858, originally as an iron-hulled, two-masted paddle steamer named Douglas (also referred to as RMS Douglas, reflecting her Royal Mail Ship designation). She was launched on 28 May 1858 and delivered to the Isle of Man Steam Packet Company, which operated her on the route between Liverpool, England, and Douglas on the Isle of Man. She was approximately 205 feet (62.5 m) long with a beam of 26 feet (7.9 m) and a gross tonnage of about 700 tons. During sea trials she achieved a speed of 17.75 knots, making her one of the fastest channel steamers of her time. She entered service in July 1858 and set a record for the Douglas–Liverpool crossing at 4 hours 20 minutes.

Confederate Service (1862–1863)

In 1862, the ship was sold to Cunard, Wilson and Company, which was acting as a broker for Confederate agents Fraser, Trenholm and Company, for approximately £24,000. She was acquired for the Confederate States of America and later renamed Margaret and Jessie, after the daughters of her Confederate owner. She operated as a blockade runner, successfully evading the Union blockade on multiple occasions. On 5 November 1863, she was captured off Wilmington, North Carolina, by the U.S. Army transport Fulton and the U.S. Navy sidewheel steamers Keystone State and Nansemond.

U.S. Navy Service (1864–1879)

After being purchased from the New York Prize Court, the vessel was refitted and lengthened by 16 feet, reaching a length of 221 feet. She was armed with a 30-pounder Parrott rifle, two 12-pounder rifles, and four 24-pounder howitzers, with a displacement of approximately 950 long tons. She was commissioned as USS Gettysburg on 2 May 1864 at the New York Navy Yard, with Lieutenant Roswell Lamson in command.

During the Civil War, Gettysburg served with the North Atlantic Blockading Squadron on blockade duty and participated in both the First Battle of Fort Fisher (24–25 December 1864) and the Second Battle of Fort Fisher (15 January 1865). In the second engagement, her crew contributed to the assault on the fort's sea face.

Following the war, Gettysburg conducted a series of cruises and missions, including service in the Caribbean, assistance in laying a telegraph cable from Key West, Florida, to Havana, Cuba, hydrographic surveys in the Atlantic and the Caribbean, and a Mediterranean survey cruise from 1876 to 1879. During her Atlantic survey work in 1875, the ship's crew discovered a seamount west of Portugal that was named "Gorringe Ridge," after the ship's commanding officer, Captain Henry Honychurch Gorringe; its highest peak was named "Gettysburg" after the ship.

Disposal

Due to corrosion of her iron hull and weakened machinery, Gettysburg was decommissioned on 6 May 1879 and sold at Genoa, Italy, on 8 May 1879.

Browse

More topics to explore

    Browse all articles