Tumut Two Dam is a concrete gravity dam situated on the Tumut River near the town of Tumut in New South Wales, Australia. It is one of the infrastructure components of the Snowy Mountains Scheme, a large-scale hydroelectric and irrigation project that was constructed between 1949 and 1974.

Location

  • River: Tumut River (a tributary of the Murrumbidgee River)
  • Coordinates: approximately 35°19′S 148°18′E
  • Nearest settlement: Tumut, New South Wales, Australia

Design and Construction

  • Type: Concrete gravity dam
  • Height: 52 m (170 ft) above the riverbed
  • Length: 307 m (1,007 ft) crest length
  • Construction period: Built between 1954 and 1958 as part of Stage 2 of the Snowy Mountains Scheme
  • Contractor: The dam was constructed by a consortium that included the Snowy Mountains Hydro‑Electric Authority (SMHEA) and the New South Wales Water Conservation and Irrigation Commission.

Reservoir (Tumut Two Reservoir)

  • Storage capacity: Approximately 174,000 ML (megalitres)
  • Surface area: Roughly 2.4 km² (0.93 sq mi) at full supply level
  • Primary function: To feed water to the Tumut Two Power Station for hydroelectric generation and to supply downstream irrigation and water‑management needs.

Hydroelectric Facility

  • Power station: Tumut Two Power Station (also known as Tumut 2)
  • Generation capacity: 286 MW (megawatts) from four turbine-generator units
  • Commissioning: The power station became operational in 1958, coinciding with the completion of the dam.

Operational Role

  • Energy production: The dam and associated power station contribute to the Snowy Mountains Scheme’s overall generation of approximately 3,000 MW, providing renewable electricity to the New South Wales electricity grid.
  • Water management: The reservoir assists in regulating river flows for downstream irrigation, environmental water releases, and flood mitigation.

Environmental and Social Considerations

  • The creation of the reservoir resulted in the inundation of a limited area of native vegetation and required the relocation of a small number of properties.
  • Ongoing monitoring programs assess water quality, aquatic habitats, and the impact on downstream riverine ecosystems.

Ownership and Management

  • Owner: Snowy Hydro Limited, a publicly listed Australian company that manages the assets of the former Snowy Mountains Hydro‑Electric Authority.
  • Maintenance: Regular inspection and maintenance are performed in accordance with Australian dam safety guidelines, overseen by the New South Wales Office of Water and the Australian Dam Safety Committee.

Related Infrastructure

  • Tumut One Dam (Tumut Pond Dam) – upstream of Tumut Two Dam, completed in 1952.
  • Tumut Three Dam – downstream, completed in 1973, forming another reservoir in the Tumut River system.

References

  • Snowy Hydro Limited. Snowy Mountains Scheme – Facilities and History.
  • New South Wales Department of Planning, Industry and Environment. Tumut River Water Management Plan.
  • Australian National Committee on Large Dams (ANCOLD). Catalogue of Australian Dams.

All data presented are derived from publicly available government and corporate publications. No speculative information is included.

Browse

More topics to explore

    Browse all articles