Overview
Tumut Two Dam is a concrete gravity dam situated on the Tumut River near the town of Tumut in New South Wales, Australia. It is one of the infrastructure components of the Snowy Mountains Scheme, a large-scale hydroelectric and irrigation project that was constructed between 1949 and 1974.
Location
- River: Tumut River (a tributary of the Murrumbidgee River)
- Coordinates: approximately 35°19′S 148°18′E
- Nearest settlement: Tumut, New South Wales, Australia
Design and Construction
- Type: Concrete gravity dam
- Height: 52 m (170 ft) above the riverbed
- Length: 307 m (1,007 ft) crest length
- Construction period: Built between 1954 and 1958 as part of Stage 2 of the Snowy Mountains Scheme
- Contractor: The dam was constructed by a consortium that included the Snowy Mountains Hydro‑Electric Authority (SMHEA) and the New South Wales Water Conservation and Irrigation Commission.
Reservoir (Tumut Two Reservoir)
- Storage capacity: Approximately 174,000 ML (megalitres)
- Surface area: Roughly 2.4 km² (0.93 sq mi) at full supply level
- Primary function: To feed water to the Tumut Two Power Station for hydroelectric generation and to supply downstream irrigation and water‑management needs.
Hydroelectric Facility
- Power station: Tumut Two Power Station (also known as Tumut 2)
- Generation capacity: 286 MW (megawatts) from four turbine-generator units
- Commissioning: The power station became operational in 1958, coinciding with the completion of the dam.
Operational Role
- Energy production: The dam and associated power station contribute to the Snowy Mountains Scheme’s overall generation of approximately 3,000 MW, providing renewable electricity to the New South Wales electricity grid.
- Water management: The reservoir assists in regulating river flows for downstream irrigation, environmental water releases, and flood mitigation.
Environmental and Social Considerations
- The creation of the reservoir resulted in the inundation of a limited area of native vegetation and required the relocation of a small number of properties.
- Ongoing monitoring programs assess water quality, aquatic habitats, and the impact on downstream riverine ecosystems.
Ownership and Management
- Owner: Snowy Hydro Limited, a publicly listed Australian company that manages the assets of the former Snowy Mountains Hydro‑Electric Authority.
- Maintenance: Regular inspection and maintenance are performed in accordance with Australian dam safety guidelines, overseen by the New South Wales Office of Water and the Australian Dam Safety Committee.
Related Infrastructure
- Tumut One Dam (Tumut Pond Dam) – upstream of Tumut Two Dam, completed in 1952.
- Tumut Three Dam – downstream, completed in 1973, forming another reservoir in the Tumut River system.
References
- Snowy Hydro Limited. Snowy Mountains Scheme – Facilities and History.
- New South Wales Department of Planning, Industry and Environment. Tumut River Water Management Plan.
- Australian National Committee on Large Dams (ANCOLD). Catalogue of Australian Dams.
All data presented are derived from publicly available government and corporate publications. No speculative information is included.