WIPIVERSE All articles

Trillium Line

The Trillium Line is a diesel‑powered light rail transit (LRT) line operated by OC Transpo in Ottawa, Ontario, Canada. It is designated as Line 2 of the city’s O‑Train network and provides north‑south service connecting the central transit hub at Bayview station with suburban areas to the south.

History

  • Planning for a rapid transit line along the north‑south corridor began in the 1990s.
  • The line opened on October 15 2001 as the “Original O‑Train,” making it Canada’s first modern LRT line to use diesel multiple‑unit (DMU) vehicles.
  • Initially, the line ran between Bayview and Greenboro stations, covering approximately 8.4 km.

Route and Operations

  • The Trillium Line operates on a single‑track alignment with passing sidings at selected stations to allow bidirectional service.
  • Service frequencies typically range from 10 minutes during peak periods to 15 minutes off‑peak, with adjustments made for holidays and special events.
  • The line is fully integrated with the OC Transpo fare system, allowing seamless transfers to the Confederation Line (Line 1) and bus network.

Rolling Stock

  • The line uses Bombardier (now Alstom) Flexity Outlook DMU vehicles, each approximately 30 meters long and capable of operating on the line’s 750 V DC power supplied by on‑board diesel generators.
  • Vehicles provide low‑floor boarding to accommodate passengers with reduced mobility.

Extensions and Future Development

  • Stage 2 Expansion: As part of the O‑Train Stage 2 project, the Trillium Line has been extended north to the Riverside South neighbourhood and south to the Ottawa International Airport. The extension adds roughly 12 km of track and introduces new stations, increasing the line’s total length to approximately 16 km.
  • The extension incorporates a transition to electric power for new rolling stock, though existing diesel‑powered units continue to operate on the original segment pending fleet replacement.
  • Completion of the Stage 2 extension was achieved in 2023, with full service commencing in 2024.

Ridership

  • In the fiscal year 2022‑2023, the Trillium Line recorded an average weekday ridership of roughly 18,000 boardings. Ridership levels have risen following the inauguration of the Stage 2 extension.

References

  • OC Transpo official publications and service reports.
  • City of Ottawa transportation planning documents.
  • Canadian Urban Transit Association (CUTA) statistics.
Browse

More topics to explore

    Browse all articles