Temple Footbridge

Temple Footbridge is a pedestrian-only footbridge spanning the River Thames near Hurley, Berkshire, England. It connects the south bank in the parish of Hurley, Berkshire, with the north bank in the parish of Bisham, Buckinghamshire, crossing the Thames just upstream of Temple Lock.

History

The bridge was constructed in 1989 specifically for walkers using the Thames Path. Prior to its construction, users of the Thames Path were required to take a detour away from the riverbank and follow a road through Bisham and Marlow. The bridge was officially opened by Lord Hesketh on 24 May 1989, following a campaign led by Margaret Bowdery, a local advocate for public access to open spaces and footpath improvements. As part of the campaign, she organised a "Golden Boot" appeal that raised over £2,000 towards construction. Previously, a ferry had operated at this location to carry the towpath across the river when barges were being towed; that ferry ceased operation in 1953.

Name

The name "Temple" derives from Temple Mill Island, which was historically owned by the Knights Templar. The island was the site of a mill that produced copper sheets used in the construction of ships for the Royal Navy, powered by a large water wheel.

Design and specifications

The bridge is a haunched girder bridge with a wooden deck. With a total length of approximately 150 feet (46 metres) or 88 yards (80 m), it is recognised as the longest hardwood bridge in Britain. The central span provides a clearance of approximately 6.5 metres (21.4 ft) above the water, allowing for the passage of a range of river vessels.

Closures and structural issues

In May 2019, the bridge was declared unsafe and closed to pedestrians, but it was repaired and reopened later that June.

On 15 May 2023, the bridge was closed again by the Environment Agency due to deck boards degrading faster than anticipated. The bridge, constructed from tropical hardwood and designed with an approximate lifespan of 30 years, was found to have numerous structural and safety concerns. In September 2023, the Environment Agency reported that immediate repairs were not possible and that the bridge would remain closed for an extended period.

Between November 2025 and February 2026, large sections of the bridge — including the central span and side spans — were removed and inspected. These sections were deemed to have deteriorated beyond the point of economical repair. In December 2025, it was announced that the bridge would remain closed for months, with restoration or replacement not expected until at least 2028.