Tape-out (also spelled tapeout) is a significant milestone in the design and manufacturing of integrated circuits (ICs) and printed circuit boards (PCBs). It denotes the final stage of the design process in which the completed design data—specifically, the graphic data for the photomask of the circuit—is released to a semiconductor fabrication facility (foundry) for manufacturing.

Origin of the term

The name "tape-out" derives from historical practice, when the final electronic design files were recorded onto reels of magnetic tape (and earlier, paper tape) and physically transported to the manufacturing facility. Although modern designs are transmitted electronically, the term has persisted as industry-standard terminology.

Role in the design flow

A modern integrated circuit undergoes a lengthy and complex design process before it reaches tape-out, typically employing electronic design automation (EDA) software tools. The design must pass a series of verification checks collectively referred to as "signoff" before it can be taped out. These verifications ensure the design meets the required specifications, timing, power, and manufacturability constraints.

Post-tape-out procedures

In current practice, the foundry performs additional checks and modifications to the mask design before the actual tape-out is completed. These modifications can include:

  • Chip finishing — adding structures to improve manufacturability, such as seal rings and filler structures.
  • Reticle layout — producing a layout that includes test patterns and alignment marks.
  • Layout-to-mask preparation — enhancing layout data with graphics operations and adjusting the data for mask production devices, including resolution enhancement technologies (RET) such as optical proximity correction (OPC), which compensates for optical effects when etching nanoscale features.

Iterative nature

Tape-out is rarely the end of the design team's work. Most chips undergo a series of iterations, called "spins," in which errors are identified and corrected after testing the first physical samples. Iterations may be required if the design fails final checks at the foundry due to manufacturability issues, or if the fabricated chip fails functional testing.

Synonyms

Different companies have used alternative terminology for the same concept. At IBM, the equivalent term is RIT (release interface tape), differentiated into RIT-A for non-metallic structures and RIT-B for metal layers. At Texas Instruments, the term PG (pattern generation) has been used.

Significance

Tape-out represents a transition point where the design is committed to physical fabrication. Because manufacturing an IC is costly and time-consuming, tape-out is a carefully gated milestone. Successfully achieving tape-out is typically a cause for celebration among project teams, though it is followed by the anticipation of awaiting the first fabricated samples from the foundry.