The Southwest Corridor, also known as the Southwest Expressway, refers to a roadway and transit project in Boston, Massachusetts, that was planned but never fully built as originally designed. It was conceived as an eight-lane highway intended to bring traffic into Boston from the southwestern direction of downtown, connecting with Interstate 95 (I-95) at Route 128.

Historical Background

The corridor follows the right-of-way of the former Penn Central/New Haven Railroad mainline (now part of the Amtrak Northeast Corridor), running from Readville north through Roslindale, Forest Hills, and Jamaica Plain, where it would have met the also-canceled I-695 (Inner Belt Expressway) project. A related proposal, the four-lane South End Bypass, was planned to run along the railroad corridor between I-695 in Roxbury and I-90 near Back Bay.

Planning and Cancellation

The highway project originated in 1948 with Massachusetts Public Works director William F. Callahan's Master Highway Plan for Metropolitan Boston. The plan underwent several revisions before being terminated in 1972 by Governor Francis Sargent following significant community opposition. In 1970, Governor Sargent declared a moratorium on all expressway construction within Route 128, following recommendations from the Boston Transportation Planning Review, a task force of independent experts headed by Alan Altshuler.

The affected communities—including Jamaica Plain, Roxbury, the South End, and Back Bay—had witnessed the disruptive housing clearances required for the Interstate 93 expressway and Massachusetts Turnpike, as well as similar projects in other cities, and were largely unwilling to repeat those costs for another expressway. The federal Interstate Highway Option, which permitted states to transfer funds earmarked for highway construction to mass transit projects, was approved by Congress in 1973. Transportation planner Fred Salvucci described Governor Sargent's decision to cancel the expressway before that transfer was approved as a leap of faith.

Post-Cancellation Development

Following the cancellation, the cleared land was repurposed rather than used for a highway. The corridor was developed to accommodate:

  • Two tracks for the MBTA Orange Line, which was relocated from its original Washington Street Elevated route
  • Three tracks for Amtrak's Northeast Corridor and the MBTA's Needham and Readville commuter rail lines
  • A 52-acre (210,000 m²) linear park on the surface, developed as the Southwest Corridor Park

The Southwest Corridor Park, managed by the Massachusetts Department of Conservation and Recreation, extends approximately 4.1 miles (6.6 km) from the South End and Back Bay neighborhoods through Northeastern University's campus to the Forest Hills section of Jamaica Plain. It includes walking and bicycle pathways, gardens, playgrounds, and recreational facilities.

Recognition

In 1989, the Southwest Corridor project received a Federal Design Achievement Award from the National Endowment for the Arts, which described it as "a model for contemporary urban design." The project is widely cited as a significant example of successful community activism in response to urban highway construction, forming part of the broader "highway revolts" movement of the 1960s and 1970s in the United States.