Santee Cooper, officially known as the South Carolina Public Service Authority, is a state-owned electric and water utility in South Carolina, United States. It was established in 1934 during the New Deal era as a rural electrification and public works project.
History
Santee Cooper was created to bring electricity to rural areas of South Carolina and to serve as a public works project during the Great Depression. The Santee Cooper Power and Navigation Project, constructed in 1939, involved creating Lake Marion and Lake Moultrie by damming and redirecting the Santee and Cooper rivers. At the time, it was described as the largest land-clearing project in U.S. history, with over 12,500 workers clearing more than 177,000 acres (720 km²) of swamp and forestland. The project included 42 miles (68 km) of dams and dikes, and the Pinopolis Dam featured what was then the highest single-lift navigation lock in the world. First electricity was generated on February 17, 1942.
Operations
Santee Cooper is headquartered in Moncks Corner, South Carolina. The utility directly serves more than 165,000 residential and commercial customers in Berkeley, Georgetown, and Horry counties. It also supplies power to 30 large industrial customers, the cities of Bamberg and Georgetown, and Charleston Air Force Base. Additionally, Santee Cooper generates power distributed by some of South Carolina's electric cooperatives, making it the ultimate source of electricity for approximately 2 million people across the state.
Its power generation portfolio includes coal, natural gas, nuclear, hydroelectric, solar, landfill gas, and wood biomass sources. Key power plants include the Cross Station (2,390 MW, refined coal), the Rainey Station (1,102 MW, natural gas), and the Winyah Station (1,260 MW, refined coal). Santee Cooper also owns one-third of the Virgil C. Summer Nuclear Station.
Governance
A board of directors appointed by the governor and approved by the state Senate governs Santee Cooper. Following the abandonment of construction of two new nuclear reactors at the V.C. Summer Nuclear Station in 2017—which left Santee Cooper with approximately $4.4 billion in debt for partial construction—the utility faced significant scrutiny. In June 2021, the South Carolina General Assembly passed Act 90, which brought Santee Cooper under the regulatory purview of the South Carolina Public Service Commission while maintaining its state-owned status. The reform also restructured the board of directors, reducing term limits and imposing restrictions on severance packages.