WIPIVERSE All articles

Sümerbank Branch

Sümerbank Branch (Turkish: Sümerbank şube demiryolu or Nazilli-Sümerbank Banliyösu), locally referred to as Gıdıgıdı (an onomatopoeic term meaning "chug chug"), was a short branch railway line in Nazilli, Aydın Province, Turkey. It was built in 1937 to transport workers between the Nazilli railway station and the Sümerbank textile printing factory (Nazilli Sümerbank Basma Fabrikası).

History and Operation

The railway line was constructed in conjunction with the Sümerbank factory, which opened on 9 October 1937 with an inauguration ceremony attended by President Mustafa Kemal Atatürk, Prime Minister İsmet İnönü, and Economy Minister Celâl Bayar, who arrived in Nazilli via a special train from İzmir.

The line was 2.37 kilometers (1.47 miles) long, built to standard gauge (1,435 mm), and connected two stations: Nazilli railway station (on the İzmir-Eğirdir main line) and the Sümerbank factory. The railway was owned and operated by Sümerbank itself, making it the first private commuter railway in the Republic of Turkey. Although the employees were certified by TCDD (Turkish State Railways), they remained Sümerbank personnel with special collective bargaining provisions.

Rolling Stock

The railway used a Ruston shunting locomotive (manufactured by Ruston & Hornsby) and a single railcar originally from the Ottoman Railway Company (ORC). The train sets pulled by this locomotive became popularly known as "Gıdıgıdı" due to the chugging sound they made.

Closure and Later Years

The line operated continuously until 1980, when it was closed. After the Sümerbank factory itself shut down in 2003, the railway assets were transferred to Aydın Adnan Menderes University. The locomotive made its final run in 2006. In 2015, the train was restored and operated for nostalgic excursion services under its last chief engineer, Necati Vanlıyız. Following his death in 2020, the nostalgic services also ended.

As of the present day, the railway alignment partially survives, with pedestrian landscaping along parts of the route. However, the original starting station within Nazilli has been demolished, and the tracks where the Aydın-Denizli highway crosses have been removed.

Browse

More topics to explore

    Browse all articles