Piran Dam is a stone and concrete hydroelectric dam on the Piran stream, located approximately 6.2 km (3.9 mi) east of the town of Piran in Sarpol-e Zahab County, Kermanshah Province, Iran. It is an operational hydroelectric facility primarily intended for electricity generation.
History and construction
Preliminary studies for the project began in 1989 and were completed by 2000. The main contractor was selected in 2007, and construction began in 2008. The dam was inaugurated on 24 November 2011 at a reported cost of more than US$15 million.
Technical specifications
The dam is 7.5 meters (25 ft) high and 25 meters (82 ft) long. It creates a reservoir with a total capacity of 15,000 cubic meters (approximately 12 acre-feet) and a surface area of 10,000 square meters (approximately 110,000 sq ft). The project includes a 212-meter transfer channel, 1,572 meters of siphon pipes, and an 800-meter outlet channel.
Power station
The associated power plant has an installed capacity of 8.4 MW, with two Pelton turbines manufactured by Ghet Hydro Energy and two generators manufactured by WEG. Annual generation is reported at approximately 40 GWh.
Additional details
- Coordinates: 34°28′49.29″N 46°00′15.31″E
- Owner: IWPCO (Iran Water and Power Resources Development Company)
- Status: Operational
The dam impounds the Piran stream and serves the purposes of hydroelectricity generation and regional water management.