Pattiseema Lift Irrigation Project

The Pattiseema Lift Irrigation Project is a major inter-basin water transfer project located in the Indian state of Andhra Pradesh. It is designed to divert surplus floodwater from the Godavari River to the Krishna River basin to stabilize irrigation command areas in the Krishna Delta and address water scarcity in the Rayalaseema region.

Location and Geography The project is situated near Pattiseema village in the Eluru district (formerly West Godavari district) of Andhra Pradesh. The intake well and pump house are located on the left bank of the Godavari River, downstream of the Polavaram Project site (near the confluence of the Sabari River). The project lifts water into the Polavaram Right Main Canal (PRMC), which acts as the carrier canal to transfer water to the Krishna River system via the Budameru diversion canal and the Krishna Western Delta canals.

Technical Specifications

  • Capacity: The project has an installed pumping capacity of 240 cubic meters per second (cumecs) (approx. 8,500 cusecs).
  • Pumping Machinery: It utilizes 24 vertical mixed-flow pumps, each with a capacity of 10 cumecs, driven by 8,000 HP motors.
  • Static Head: The design static head is approximately 35 meters.
  • Power Requirement: The project requires significant electrical power (approx. 140–150 MW) for operation during flood periods.
  • Canal System: Water discharged into the Polavaram Right Main Canal travels approximately 174 km to reach the Krishna River system (specifically the Prakasam Barrage / Krishna Western Delta headworks).

Objective and Benefits The primary objective is to utilize a portion of the Godavari River’s floodwater (specifically 80 TMC ft allocated under the Godavari Water Disputes Tribunal award) which would otherwise flow into the sea. Key benefits include:

  • Krishna Delta Stabilization: Providing assured irrigation to the Krishna Western Delta (approx. 6–7 lakh acres) during deficit rainfall years in the Krishna basin.
  • Rayalaseema Supply: Facilitating water transfer to the Rayalaseema region via the Pothireddypadu Head Regulator and the Galeru-Nagari Sujala Sravanthi project.
  • Drinking Water: Supplying drinking water to villages and towns en route, including Vijayawada city.

History and Implementation

  • Conceptualization: The concept of Godavari-Krishna interlinking dates back several decades, forming part of the National Water Development Agency (NWDA) proposals.
  • Fast-Track Execution: The project was taken up on a fast-track basis by the Government of Andhra Pradesh in 2015 as a "lift irrigation" component to expedite the utilization of Godavari water pending the completion of the Polavaram Multipurpose Project (which involves a gravity flow component via a reservoir).
  • Construction: Engineering, Procurement, and Construction (EPC) contracts were awarded to Megha Engineering & Infrastructures Ltd (MEIL).
  • Commissioning: The project was inaugurated and commissioned on March 16, 2016. It was completed in a record time of approximately 11 months.
  • Operations: The project operates seasonally, typically during the monsoon flood season (July–October), when surplus water is available in the Godavari River at the Pattiseema location.

Significance Upon commissioning, it was cited as one of the fastest completed major lift irrigation projects in India. It serves as a critical operational link for water security in the coastal Andhra and Rayalaseema regions, functioning independently of the Polavaram Project's reservoir storage timeline.

Administrative Control The project is owned, operated, and maintained by the Water Resources Department, Government of Andhra Pradesh.