The OPAL (Ostsee-Pipeline-Anbindungsleitung, German for "Baltic Sea Pipeline Connector") is a natural gas pipeline in Germany running alongside the country's eastern border. It is one of two projected pipelines connecting the Nord Stream 1 pipeline to the existing pipeline grid in Middle and Western Europe, the other being the NEL pipeline.
Route
The 470-kilometre (290 mi) long pipeline runs from Lubmin near Greifswald in northeastern Germany to Olbernhau near the German–Czech border. It connects the Nord Stream pipeline with the JAGAL (which distributes gas from the Yamal–Europe pipeline) and the STEGAL (which distributes gas from the Central-European Russian gas transit system via Czechia and Slovakia) pipelines in Germany. On the German–Czech border, the pipeline connects with the Gazela Pipeline to link gas export pipelines in Czechia.
Technical features
The pipeline has a diameter of 1,400 millimetres (55 in) and an operating pressure of up to 100 bars (10,000 kPa). Its capacity is 35 billion cubic metres (1.2 trillion cubic feet) per year of natural gas. The compressor station in Radeland, Brandenburg, was built by Siemens. The pipeline cost approximately €1 billion. Construction was completed in 2011, and in August 2011 Nord Stream was connected with the OPAL pipeline.
Project company
The pipeline was constructed by OPAL NEL TRANSPORT GmbH, a subsidiary of Wingas. It is operated by OPAL Gastransport GmbH & Co KG, owned by WIGA Transport Beteiligungs-GmbH & Co. KG, a joint venture of Wintershall Dea and Gazprom.
Access by Gazprom
Polish state-run gas firm PGNiG and PGNiG Supply & Trading attempted to restrict Gazprom's access to the pipeline. The Oberlandesgericht Düsseldorf (Düsseldorf Higher Regional Court) lifted the restrictions. Following this decision, Gazprom increased its throughput to 72.5 million m³/d (26.462 billion m³/year).
Ownership and regulation
In accordance with a European Commission state aid approval decision of 20 December 2022, Uniper launched the sale of its 20% stake in the regulated OPAL gas pipeline. Since 1 July 2023, GASCADE's share in OPAL has been fully subject to regulation, and GASCADE's pipeline system grew by 473 kilometres as a result.