Network 2011 was a long-term rapid transit expansion plan developed by the Toronto Transit Commission (TTC) in 1985 with the full title Network 2011: A Rapid Transit Plan for Metropolitan Toronto. It proposed three new subway lines to be substantially completed by 2011: the Sheppard Line, the Downtown Relief Line, and the Eglinton West Line.

Background By the early 1980s, the TTC had concluded that no further subway extensions were imminent due to rising construction costs and the 1982 recession. Meanwhile, Metropolitan Toronto had experienced the cancellation of expressway projects (e.g., the Spadina Expressway) and the failure of the provincial GO-Urban maglev and ICTS (Intermediate Capacity Transit System) experiments. In this context, the TTC under planner Jiri Pill drafted a plan that would nearly double Toronto's rapid transit network while avoiding experimental technologies, relying instead on conventional subway designs.

The Plan The plan contained five main elements with a total estimated cost of approximately $2.7 billion:

  1. Sheppard Subway (Phase 1) – From Yonge Street to Victoria Park Avenue. Estimated cost: $500 million. This was designated the top priority.
  2. Downtown Relief Line (DRL) – Running from Union Station to Donlands Station, intended to relieve overcrowding at the Bloor–Yonge interchange. Estimated cost: $565 million with a projected opening in 1998.
  3. Eglinton West Busway – A temporary busway on Eglinton Avenue West to be completed by 2003 at a cost of $365 million.
  4. Sheppard Subway (Phase 2) – Extending the Sheppard Line east to Scarborough Town Centre and west to Dufferin Street. Projected opening in 2009 at $740 million.
  5. Eglinton West Rapid Transit – Replacement of the busway with either light rail or a full subway, with construction to begin in 2011 at an estimated cost of $425 million.

Adoption and Political Controversy The plan was well received and approved by Metro Council in June 1986. However, disputes arose among suburban mayors over which line should be built first. North York's mayor Mel Lastman pushed for Sheppard; the mayors of York and Etobicoke favoured the Eglinton Line. Provincial politics further complicated implementation. The 1985 election of a Liberal government under David Peterson replaced the historically supportive Conservative government, and the plan was subjected to reviews and revisions. In April 1990, the Peterson government announced the "Let's Move" program, which added elements but dropped the Downtown Relief Line.

Implementation and Outcomes The 1990 election brought the NDP government of Bob Rae, which released a scaled-back Rapid Transit Expansion Program in 1993 retaining truncated versions of the Sheppard and Eglinton lines. Construction began on both, but the 1995 election of Mike Harris's Progressive Conservative government led to the cancellation of the Eglinton West subway (the tunnel that had been built was later filled in). The Sheppard Line proceeded only between Yonge Street and Don Mills, opening in November 2002 at a cost of approximately $1 billion.

Of the original Network 2011 plan, only the short Sheppard "stub" and the Spadina extension to Downsview Station (opened in 1996) were completed within the original scope. The Downtown Relief Line never broke ground.

Legacy Decades later, the congestion problems that Network 2011 sought to address had worsened significantly. This led to revived versions of the original proposals: the Eglinton route was reconceived as the Eglinton Crosstown LRT (opened February 2026 after years of delays), and the Downtown Relief Line was revived as the Ontario Line, which as of 2026 remains under construction with a projected opening in 2031. The plan is frequently cited by transit historians and planners as an example of ambitious long-term transit planning in Toronto that fell victim to changing political priorities.