WIPIVERSE All articles

Nanjai Uthukuli Canal

Nanjai Uthukuli Canal is an irrigation canal that runs in the southern part of Erode city in Tamil Nadu, India. It is a secondary canal that branches off from the Perumpallam canal at the Perumpallam Anicut (also spelled Anaicut), a dam constructed near Surampatti in 1966 to store water.

The canal spans approximately 15 kilometers (9.3 miles) and irrigates around 2,450 to 2,500 acres (about 1,000 hectares) of farmland. It flows through the areas of Kasipalayam, Sastri Nagar, Moolapalayam, Nochikattuvalasu, Karukkampalayam, Subbarayavalasu, Lakkapuram, 46 Pudur, Muthugoundenpalayam, Chinniyampalayam, and Nanjai Uthukuli, before terminating near a wetland north of Savadipalayam Pudur (also referred to as Chavadipalayam Pudur).

The Perumpallam canal, which feeds the Nanjai Uthukuli Canal, begins from Kadirampatti in Erode and passes through Surampatti before entering the River Cauvery at Vendipalayam. It is fed by seepage from the Lower Bhavani Project (LBP) canal and rainwater.

Due to rapid urbanization in Erode, the canal has been severely affected by the dumping of solid waste, plastic garbage, and sewage from surrounding residential areas, causing it to remain dry for most of the year. In 2015, the Olirum Erodu Foundation and Tamilaga Vivasaigal Sangam jointly de-silted and deepened the canal. In September 2024, after an eight-year gap, dredging work was again inaugurated along the entire canal stretch by Tamil Nadu Minister for Housing and Urban Development S. Muthusamy, along with Mayor S. Nagarathinam and Corporation Commissioner Narnaware Manish Shankarrao. The project was undertaken with contributions from the Water Resources Department and private organizations, using a long-reach excavator to clear waste. Farmers have noted that the canal helps recharge groundwater in many village panchayats, benefiting thousands of households and farmlands.

Browse

More topics to explore

    Browse all articles