The Monroe Power Plant is a coal-fired power plant located in Monroe, Michigan, on the western shore of Lake Erie. It is owned and operated by the DTE Energy Electric Company, a subsidiary of DTE Energy. Construction was completed in the early 1970s, and the plant began commercial operation in 1971.
The facility consists of four generating units, each with an output of approximately 850 megawatts, for a total nameplate capacity of 3,400 megawatts (with a net output of approximately 3,300 megawatts, as about 100 megawatts are required to operate the plant's own machinery). This makes it one of the largest electric generating plants in the United States. The four units were commissioned between 1971 and 1974. The plant burns primarily low-sulfur western coal blended with bituminous coal.
The Monroe Power Plant connects to the electrical grid via numerous 120,000-volt and 345,000-volt transmission lines, owned and maintained by ITC Transmission. Two of the 345 kV lines interconnect with FirstEnergy in Ohio.
Emissions Control
The plant has undergone significant environmental upgrades. Flue-gas desulfurization (FGD) units, commonly known as sulfur-oxide "scrubbers," are installed on all four generating units and reduce over 95% of sulfur dioxide (SO₂) emissions. Selective catalytic reduction (SCR) systems are also in place on all units, reducing nitrogen oxide (NOₓ) emissions by approximately 90% by combining ammonia with NOₓ over a catalyst.
Planned Retirement
In its 2022 Integrated Resource Plan, DTE Energy accelerated the timeline for the plant's retirement. Under a settlement agreement filed in July 2023 with the Michigan Public Service Commission, the plant is scheduled to close two of its units in 2028 and the remaining two units by 2032—three years ahead of the originally proposed 2035 retirement date. The Monroe Power Plant has been identified as one of the top emitters of carbon dioxide in the United States according to federal data. As of the most recent reporting, no replacement plans for the 3,400 megawatts of generating capacity have been finalized.