The Milton line is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Milton, by way of Mississauga, covering a distance of approximately 50.2 km (31.2 mi). It opened on October 25, 1981, and is operated by GO Transit on tracks largely owned by Canadian Pacific Kansas City (CPKC).
Service
Trains on the Milton line run in the peak direction during peak periods, with service primarily oriented toward morning inbound (to Toronto) and afternoon outbound (from Toronto) commuters. As of 2019, the line carried approximately 15,300 passengers per day. The line serves nine stations: Union Station, Kipling, Dixie, Cooksville, Erindale, Streetsville, Meadowvale, Lisgar, and Milton.
History
The Canadian Pacific Railway (CPR) long resisted passenger service on its freight line through Mississauga. Following the 1979 Mississauga train derailment—a major freight train derailment involving hazardous materials near Mavis Road—the City of Mississauga, led by Mayor Hazel McCallion, threatened to sue CPR. As part of a settlement, CPR dropped its opposition to passenger service on the corridor, enabling the creation of the Milton line.
Service began with three round trips per weekday. Additional trips were added over the decades: a sixth trip in 2002, a seventh in 2009, an eighth in 2011, a ninth in 2015, and a tenth in 2016.
Service Expansion
The Milton line has been the subject of ongoing plans for two-way, all-day service. The original "Big Move" regional transportation plan (2008) called for such service by 2023, but this was later deferred to a 16-to-25-year horizon due to infrastructure challenges and the need to negotiate with CPKC, which operates freight traffic on the same corridor. In February 2024, the Ontario government announced a plan to build dedicated tracks in the Milton corridor to enable two-way all-day service, with an estimated cost exceeding $6 billion.
Unique Characteristics
The Milton line is the only GO Transit rail line that operates primarily on CPKC-owned tracks (all other GO lines use tracks owned or leased from Canadian National or Metrolinx). This has historically made service expansion more complex, as CPKC's freight operations take priority on the corridor. It was also the first GO line other than the Lakeshore line to offer midday service (from 1990 to 1996).