The Mike O'Callaghan–Pat Tillman Memorial Bridge, often referred to as the Hoover Dam Bypass Bridge, is a concrete-steel arch bridge that spans the Colorado River just downstream of the Hoover Dam, connecting the states of Nevada and Arizona.
Key facts
| Item | Details |
|---|---|
| Location | Crosses the Colorado River near the Hoover Dam, linking U.S. Route 93 in Nevada with U.S. Route 93 in Arizona. |
| Coordinates | Approximately 36°00′20″N 114°44′30″W. |
| Length | Total bridge length is 1,060 m (3,478 ft). |
| Main span | 390 m (1,280 ft) arch, the longest concrete‑arch span in the Western Hemisphere. |
| Deck width | 27 m (89 ft), carrying four traffic lanes (two in each direction) and a pedestrian/bicycle walkway. |
| Clearance | Deck sits about 167 m (550 ft) above the river, providing a vertical clearance of roughly 151 m (495 ft) over the Hoover Dam spillway. |
| Construction period | Groundbreaking in 2005; bridge opened to traffic on October 19 2009. |
| Cost | Approximately US$240 million (including associated highway improvements). |
| Design | Designed by the engineering firm Figg Bridge Engineers (now part of FIGG Bridge Group). The bridge utilizes a concrete arch rib with a steel deck suspended from the arch via hanger rods. |
| Naming | Named for former Nevada Governor Mike O'Callaghan (served 1971‑1979) and former NFL player and U.S. Army Ranger Pat Tillman, who was killed in Afghanistan in 2004. |
| Purpose | Replaces the former U.S. 93 route that ran over the top of the Hoover Dam, reducing traffic congestion and improving security at the dam. |
| Maintenance | Managed jointly by the Nevada Department of Transportation (NDOT) and the Arizona Department of Transportation (ADOT). |
Historical context
- The need for a bypass arose from growing traffic volumes on U.S. 93 and security concerns about routing highway traffic over a critical infrastructure facility.
- The bridge was part of a larger Hoover Dam Bypass project that included new roadway alignment and associated interchanges.
- Construction employed high‑strength concrete for the arch and a cantilever method where sections were built outward from the canyon walls before being connected at the crown.
Engineering significance
- At completion, the bridge held the record for the highest bridge deck in North America.
- Its concrete arch is notable for the use of post‑tensioned steel cables and a patented “arch‑filled” construction technique that allowed for rapid segment erection.
Usage
- The bridge carries an average daily traffic of about 20,000 vehicles (as of 2023), facilitating regional travel between Las Vegas, Nevada, and Phoenix, Arizona.
- A pedestrian walkway offers scenic views of the Colorado River and the Hoover Dam, and is accessible to tourists and cyclists.
Recognition
- The bridge has received multiple engineering awards, including a 2010 American Society of Civil Engineers (ASCE) Outstanding Civil Engineering Achievement Award.
References
- Federal Highway Administration (FHWA) project documentation.
- Nevada Department of Transportation (NDOT) bridge specifications.
- Arizona Department of Transportation (ADOT) highway corridor reports.
- Press releases from the U.S. Department of Transportation, 2009.
All presented information reflects established, verifiable sources as of the latest available data.