Meerut Metro is a planned rapid transit system intended to serve the city of Meerut in the state of Uttar Pradesh, India. It is designed to function as an intracity local transit feeder to the Delhi–Meerut Regional Rapid Transit System (RRTS), also known as Namo Bharat.
Overview
The project is being implemented by the Uttar Pradesh Metro Rail Corporation (UPMRC) on behalf of the Government of Uttar Pradesh. The system is planned to operate on a section of the Delhi–Meerut RRTS corridor within the Meerut city limits, utilizing the same standard-gauge tracks and infrastructure constructed by the National Capital Region Transport Corporation (NCRTC).
Route and Stations
The Meerut Metro corridor is planned to span approximately 23 kilometres (approx. 14.3 miles) with 13 stations. The route runs from Meerut South RRTS Station to Modipuram Depot.
Proposed Stations:
- Meerut South (RRTS Interchange)
- Partapur
- Rithani
- Shatabdi Nagar
- Devlok
- Meerut Central (RRTS Interchange)
- Bhainsali
- Begampul
- MES Colony
- Daurli
- Meerut North (RRTS Interchange)
- Modipuram
- Modipuram Depot
Integration with RRTS
A defining feature of the Meerut Metro is its integration with the Delhi–Meerut RRTS.
- Shared Infrastructure: The metro will run on the central tracks of the RRTS viaduct/tunnel within Meerut, while RRTS express services use the outer tracks.
- Rolling Stock: The Meerut Metro will use 3-car train sets (lighter and shorter than the 6-car RRTS trainsets), manufactured by Alstom. These trains have a design speed of 135 km/h and an operational speed of 120 km/h, optimized for shorter station spacing.
- Fare and Ticketing: A Common Mobility Card / National Common Mobility Card (NCMC) ecosystem is planned to allow seamless travel between the RRTS and the local Metro.
Project Status and Timeline
- Approval: The Detailed Project Report (DPR) was approved by the Uttar Pradesh Cabinet in 2019 and subsequently by the Central Government (Ministry of Housing and Urban Affairs) in March 2024.
- Funding: The project is funded jointly by the Government of India and the Government of Uttar Pradesh, with potential multilateral agency loans (e.g., Asian Development Bank).
- Construction: Civil construction for the RRTS corridor (which houses the metro tracks) is advanced. The priority section of the RRTS (Sahibabad to Duhai Depot) was inaugurated in October 2023. The Meerut South to Modipuram section (hosting the Metro) is under active construction.
- Target: Commercial operations for the Meerut Metro are targeted to commence after the full RRTS corridor becomes operational, currently projected for 2025–2026.
Rolling Stock
The trainsets for Meerut Metro are being supplied by Alstom (manufactured at their Sri City, Andhra Pradesh facility).
- Configuration: 3-car formation (Trailer Motor Car + Motor Car + Trailer Motor Car).
- Capacity: Approx. 750 passengers per train (seating + standing).
- Features: Air conditioning, CCTV surveillance, USB charging ports, dynamic route maps, wheelchair spaces, and ergonomic seating.
Significance
The Meerut Metro aims to decongest the heavily utilized road network of Meerut (particularly the Delhi–Meerut Expressway and NH-58), reduce vehicular pollution, and provide high-frequency "turn-up-and-go" connectivity (peak headways of 5–10 minutes) between residential hubs, commercial centers (Begampul, Bhainsali), and the RRTS interchange stations for onward travel to Delhi.