The Malbergbahn — also known as the Malbergbahn Bad Ems — was a funicular railway that operated between the town of Bad Ems and the summit of the Hohen Malberg in Rhineland-Palatinate, Germany. It ran from 5 June 1887 until its closure in 1979. On 7 December 1981, two years after decommissioning, it was declared a technological monument. The railway had no accidents during its entire operational period.
History
In 1872, the city of Bad Ems decided to build a hotel on the 350-meter-high Hohen Malberg to compensate for the absence of numerous foreign spa guests. To provide access to the site, construction of a funicular with a water counterbalance system was decided upon. The Malbergbahn AG was founded in 1885 and registered in the commercial register in Cologne on 3 December 1886 under the name MAG. Construction work on both the hotel and the funicular began in November 1886, and the Malbergbahn was ceremoniously put into operation on 5 June 1887.
In 1926, the concession was transferred from Malbergbahn AG to the hotel for 25 years. When the contract was not renewed in 1951, the railway became the property of the Bad Ems municipal utilities. Until its closure, the railway was well-frequented and consistently well-utilised, as the hotel, café, and zoo located on the mountain could only be reached on foot or by the railway.
When TÜV Rheinland identified serious age-related defects in 1979, and the city was financially unable to repair them, operations were initially suspended as a temporary measure. On 7 December 1981, the Malbergbahn was declared an industrial monument. By then it had suffered significant vandalism and was superficially renovated in 1999. On 20 June 2000, the Bad Ems city council decided not to restore the railway to operation.
One of the railway's carriages remains at the mountain station (no longer accessible due to risk of collapse); the other carriage remains at the valley station and has since been restored. Since 1982, a support association (Förderverein Malbergbahn e. V.) with around 150 members has worked to preserve and restore the railway. Since 2014, the valley station and its carriage have been renovated and are used as a café. In 2019, the Bad Ems city council decided to sell the mountain station to an investor.
Technology
The Malbergbahn was a water balance railway (water-ballast counterweight system) with a Riggenbach rack system, which served as the brake rail for braking and regulating vehicle speed. When stationary, it also functioned as a parking brake. The dual-track line had a track gauge of 1,000 millimetres (meter gauge) and was 520 metres long. It overcame a height difference of 260 metres with a maximum gradient of 54.5 percent (545 ‰). The maximum speed was 7 km/h until 1963, after which it increased to 12 km/h, with an average speed of 5.4 km/h. The traction cable was made of six pre-formed strands, each consisting of 19 wires on a fibre core. The railway was powered by hydroelectricity, with operational water pumped from the valley to a storage reservoir on the mountain.