WIPIVERSE All articles

MainTor

MainTor (also written Maintor) is a mixed-use high-rise building complex and urban quarter located in the Innenstadt (Old Town) district of Frankfurt am Main, Germany. The development was constructed on the approximately 21,000-square-meter former headquarters site of the chemical company Degussa, situated on the western edge of Frankfurt's old town at the transition to the banking district. It is also marketed under the name "The Riverside Financial District."

Overview

The MainTor complex consists of three main high-rise towers — the WinX Tower (110 m / 360 ft, 29 storeys), MainTor Porta (70 m / 230 ft, 18 storeys), and MainTor Panorama (64 m / 210 ft, 17 storeys) — together with additional components including the MainTor Primus (a revitalized former Degussa high-rise), MainTor Palais, MainTor Patio, and MainTor Palazzi. The complex combines offices, residential apartments, restaurants, and commercial retail spaces, with the tallest building rising to 110 meters. Construction began in 2011 and was completed in 2017, with the project designed by the architectural firm KSP Jürgen Engel Architekten.

History and Development

The site served as the Degussa headquarters after the Second World War, with the first administrative building completed in 1950 and additional structures erected through the mid-1980s. Following a series of mergers, Degussa relocated its headquarters to Düsseldorf in 2001. In 2005, the property was acquired by DIC Asset together with Morgan Stanley Real Estate Fund.

The developer presented initial plans in March 2007, which proposed opening the previously private site to the public and creating new connections between Frankfurt's old town and the banking district. The plans generated debate among local politicians, particularly regarding the height of the proposed office tower, given concerns about its proximity to Frankfurt Cathedral and UNESCO World Heritage considerations. A compromise was reached in November 2007 that reduced the central tower's height to 100 meters and repositioned it further west along Neue Mainzer Straße. The total planned investment was approximately €580 million.

Construction entered its first phase in August 2011 with demolition work, and subsequent phases delivered the individual buildings between 2014 and 2017. The project received the MIPIM AR Future Projects Award in the category "Best German Project" in February 2012.

Main Buildings

  • WinX Tower — Office and retail tower, 110 m, completed 2017.
  • MainTor Porta — Office high-rise at Weißfrauenstraße, 70 m, completed 2014. Union Investment leased the building's 22,500 m² office space for its headquarters.
  • MainTor Panorama — Office high-rise at the corner of Neue Mainzer Straße and Untermainkai, 64 m, completed 2015. Law firm CMS Hasche Sigle leased over 9,000 m² of office space.
  • MainTor Primus — Revitalized 48-meter former Degussa high-rise, redesigned and reopened in 2014.
  • MainTor Palais, Patio & Palazzi — Residential buildings along the Main riverfront, including the listed Hermann Schlosser House (1823).

Other Uses of the Term

The term "Maintor" (often capitalized as "MainTor") also appears in other contexts:

  • Maintor (Wertheim) — A historic red sandstone city gate in Wertheim, Germany, forming an important link to the town's medieval old town.
  • Maintor — A cloud-native computerised maintenance management system (CMMS) software platform for industrial plants.
  • In certain niche industrial contexts, "MainTor" has been used as a portmanteau of "maintenance" and "monitor" to refer to a person or team responsible for maintenance oversight of equipment or systems, though this usage is not widely formalized.
Browse

More topics to explore

    Browse all articles