Portugal has a diverse electricity generation mix, with a significant historical reliance on hydroelectric power and a rapid expansion of wind and solar photovoltaic capacity in the 21st century. The country has no operational nuclear power plants and has phased out coal-fired generation (the last coal plant, Pego, ceased coal operations in November 2021).
The following is a categorized overview of major power stations in Portugal, organized by primary energy source. Installed capacities are approximate and subject to change due to upgrades, decommissioning, and new commissions.
Hydroelectric Power Stations
Hydroelectricity is historically the backbone of the Portuguese electricity system. Major facilities are concentrated on the Douro, Tagus (Tejo), Cávado, and Zêzere river basins. Many large plants are pumped-storage facilities used for grid balancing.
- Alqueva Dam (Alqueva I & II): Located on the Guadiana River. Alqueva I (259 MW) and Alqueva II (259 MW) form one of the largest pumped-storage complexes in Europe. The reservoir is the largest in Western Europe.
- Foz Tua Dam: Located on the Tua River (tributary of the Douro). Capacity approx. 260 MW. Commissioned 2017.
- Baixo Sabor Dam: Located on the Sabor River (tributary of the Douro). Capacity approx. 178 MW. Commissioned 2015/2016.
- Venda Nova III (Fridão): Pumped storage on the Cávado River. Capacity approx. 388 MW.
- Alto Lindoso Dam: On the Lima River. Capacity approx. 630 MW (including pumped storage extension).
- Douro River Cascade: A series of run-of-river and reservoir plants including Carrapatelo (216 MW), Valeira (240 MW), Régua (120 MW), Bagaúste (180 MW), and Pocinho (186 MW).
- Tagus River Cascade: Includes Belver (80 MW), Fratel (132 MW), and Pracana (41 MW).
- Zêzere River Cascade: Includes Bouçã (50 MW), Cabril (108 MW), and Castelo de Bode (138 MW).
- Salamonde I & II / Venda Nova I & II / Caniçada: Part of the Cávado River complex, totaling several hundred MW.
Wind Farms
Portugal has one of the highest wind energy penetrations in the world. Wind farms are distributed across the northern and central mountain ranges and coastal areas.
- Alto Minho Wind Farm (VentoMinho): Located in Viana do Castelo district. Capacity approx. 240 MW. One of the largest onshore wind farms in Europe upon completion.
- Serra da Freita / Arada / Arestal Complex: Located in Aveiro/Viseu districts. Combined capacity over 200 MW.
- Ventominho / Ventodouro / Ventonorte portfolios: Large portfolios operated by EDP Renováveis (EDPR) and Galp/Engie (formerly Ventoinvest/Generg).
- Floating Offshore Wind: WindFloat Atlantic (offshore Viana do Castelo). Operational since 2020. Capacity 25 MW (3 x 8.4 MW turbines). It is the world's first semi-submersible floating wind farm.
Solar Photovoltaic Power Stations
Solar capacity has grown exponentially since 2019/2020 following competitive auctions.
- Alqueva Floating Solar Park: Located on the Alqueva reservoir. Capacity approx. 5 MW (pilot phase), with expansion planned. Notable for hybrid hydro-solar operation.
- Cerro da Mina / Santiago do Cacém area: Hosts several large utility-scale plants (e.g., Santiago do Cacém, Fernando Pessoa projects) totaling hundreds of MW.
- Fotovoltaica de Alcoutim / Paderne / Ourika: Large plants in the Alentejo and Algarve regions.
- Minas de São Domingos / Mertola area: Several large plants approved/under construction in the "solar corridor" of Baixo Alentejo.
Biomass and Waste-to-Energy
- Mortágua Biomass Plant: Capacity approx. 15–20 MW. Forest residues.
- Constância Biomass Plant (Celbi): Industrial cogeneration / grid export.
- LIPOR Waste-to-Energy Plant (Maia): Municipal solid waste incineration with energy recovery. Capacity approx. 18 MW.
- Valorsul Waste-to-Energy Plant (São João da Talha, Lisbon): Capacity approx. 30 MW.
- Numerous smaller biomass plants associated with pulp and paper industries (e.g., Navigator, Altri groups) and forest residue facilities.
Natural Gas Combined Cycle (CCGT) Thermal Plants
These plants provide baseload and peaking capacity, essential for balancing intermittent renewables.
- Sines Power Plant (Central Termoelétrica de Sines): CCGT. Capacity approx. 1,180 MW (two blocks). Major entry point for LNG.
- Tapada do Outeiro Power Plant (Carregado): CCGT. Capacity approx. 1,000 MW (two blocks).
- Ribatejo Power Plant (Carregado): CCGT. Capacity approx. 1,100 MW (three blocks).
- Lares Power Plant (Figueira da Foz): CCGT. Capacity approx. 850 MW.
Decommissioned / Converted Stations
- Sines Coal Power Plant (Central a Carvão de Sines): 1,256 MW (4 x 314 MW). Decommissioned January 2021.
- Pego Coal Power Plant (Central a Carvão do Pego): 628 MW (2 x 314 MW). Ceased coal combustion November 2021. Conversion to biomass/green hydrogen hub planned/underway.
- Setúbal (Carregado) Fuel Oil Plants: Older thermal groups decommissioned.
Interconnections and Grid Storage
- Interconnectors: High-voltage lines connecting to Spain (e.g., Douro International, Lindoso, Falcão, Puebla de Guzmán, Alqueva/Guadiana). Total interconnection capacity approx. 3,000–3,500 MW.
- Battery Storage: Several utility-scale Battery Energy Storage Systems (BESS) are in advanced permitting or early construction phases (e.g., projects by EDP, Galp, Iberdrola, and independent developers) to meet 2030 targets, but large-scale operational grid batteries were limited as of early 2024 compared to hydro pumped storage.
Regulatory Context
The electricity sector is liberalized. The main generation assets are owned by EDP (Energias de Portugal), Galp Energia / Engie (via 50/50 JV), Iberdrola, Endesa, TrustEnergy (China Three Gorges), and a growing number of independent renewable developers. The Transmission System Operator (TSO) is REN (Redes Energéticas Nacionais).