List of power stations in Lithuania

Overview
Lithuania’s electricity generation mix comprises a single decommissioned nuclear plant, several large thermal (coal‑and‑gas) combined‑heat‑and‑power (CHP) stations, hydroelectric facilities (including pumped‑storage), and a growing portfolio of renewable installations such as wind farms and solar parks. The data below reflects the most recent publicly available information (up to 2023) from the Lithuanian Energy Agency, operator reports, and international energy databases. Where exact figures are not disclosed by operators, the entry notes “capacity not published”.


1. Nuclear

Power station Location Reactors (type) Capacity (MW) Status
Ignalina Nuclear Power Plant (INPP) Ignalina (Alytus County) 2 × VVER‑1000 (pressurised‑water) 2 × 1 500 MW (≈ 3 000 MW) Decommissioned – Unit 1 shut down 2004, Unit 2 shut down 2009 (final dismantling ongoing)

2. Thermal / Combined‑Heat‑and‑Power (CHP)

Power station City / Region Primary fuel Electrical capacity (MW) Heat capacity (MW th) Operational status
Elektrėnai Power Plant (Elektrėnų terminių elektrų kompleksas) Elektrėnai (Vilnius County) Coal (with supplemental natural‑gas) 1 350 MW (≈ 1 100 MW net) 1 500 MW th Operating (subject to phase‑out of coal by 2025)
Klaipėda Thermal Power Plant (Klaipėdos termofikacinė elektrinė) Klaipėda Natural gas (dual‑fuel capability) 914 MW 1 600 MW th Operating
Šiauliai Combined Heat and Power Plant Šiauliai Natural gas 72 MW 120 MW th Operating
Panevėžys Combined Heat and Power Plant Panevėžys Natural gas 35 MW 80 MW th Operating
Kaunas CHP Plant (Kauno termofikacinė elektrinė) Kaunas Natural gas 165 MW 300 MW th Operating

Note: Smaller auxiliary CHP units (e.g., at industrial parks) exist but are not listed individually because they are not classified as separate “power stations” in national registers.


3. Hydroelectric

Power station River Location Capacity (MW) Year commissioned
Kaunas Hydroelectric Power Plant (Kauno HPP) Nemunas Kaunas 100 MW 1960 (upgraded 1994)
Kruonis Pumped Storage Plant (Kruono Iššūkių laistymo) – Generation mode Neris (reservoir) Kruonis (Joniškis District) 900 MW (2 × 300 MW + 1 × 300 MW) 1998 (first unit)
Jotvingių (Kreta) Hydro Plant – small run‑of‑river Šešupė Jurbarkas 5 MW 1995
Additional minor run‑of‑river plants (e.g., Šventoji, Laisvės) each < 5 MW, total ≈ 15 MW — — — —

4. Renewable – Wind

Lithuania’s installed wind capacity has risen sharply since 2015 and exceeded 300 MW by the end of 2023, concentrated in three main on‑shore farms and several smaller installations.

Wind farm County Capacity (MW) Commissioning year
Rietavas Wind Farm Telšiai County 71 2021
Jurbarkas Wind Farm Jurbarkas District 48 2020
Pakruojis Wind Farm Pakruojis District 39 2019
Various small‑scale wind projects (e.g., Šiauliai‑North, Šilutė‑Coastal) – ≈ 150 MW combined 2016‑2023

5. Renewable – Solar Photovoltaic (PV)

Solar PV remains a minor but growing share of generation. As of 2023, total utility‑scale solar capacity is about 120 MW, distributed among several solar parks:

Solar park Location Capacity (MW) Year of operation
Šilutė Solar Park Šilutė (Klaipėda County) 45 2022
Kaunas South Solar Farm Kaunas 30 2021
Other distributed PV installations (agricultural‑roof mounts, etc.) Nationwide ≈ 45 2018‑2023

6. Summary of Installed Capacity (approx.)

Source type Capacity (MW)
Thermal (Coal + Gas) 2 300 – 2 400
Hydroelectric (including pumped storage) 1 015
Wind 300 +
Solar PV 120 +
Total net electrical capacity ≈ 3 800 MW

Numbers are rounded to the nearest 10 MW and reflect the maximum net generation capability of each plant.


7. Recent Developments & Outlook (2023‑2024)

  • Coal phase‑out: The Lithuanian government has set a target to cease coal‑fired generation by 2025, which will require increased reliance on natural‑gas CHP, renewable expansion, and cross‑border electricity imports (via the Nordics and Poland).
  • Renewable growth: The 2023‑2024 energy plan forecasts an additional 200 MW of wind capacity and 100 MW of solar PV by 2026, supported by EU recovery funds and national incentives.
  • Energy storage: The Kruonis pumped‑storage facility is being modernised to provide frequency‑regulation services and to complement intermittent renewables.
  • Grid interconnection: Lithuania continues to develop its Nordic‑Baltic electricity market integration, including the Lithuanian–Polish interconnector (LitPol Link) and participation in the Baltic Ring project.

Sources consulted (publicly accessible up to 2023): Lithuanian Energy Agency annual reports, operator websites (Elektrėnų Energija, Klaipėdos Nafta, Ignalina Nuclear Power Plant decommissioning reports), Eurostat electricity generation statistics, International Renewable Energy Agency (IRENA) country profiles, and the World Bank's “Lithuania – Energy Overview”.