Overview
Lithuania’s electricity generation mix comprises a single decommissioned nuclear plant, several large thermal (coal‑and‑gas) combined‑heat‑and‑power (CHP) stations, hydroelectric facilities (including pumped‑storage), and a growing portfolio of renewable installations such as wind farms and solar parks. The data below reflects the most recent publicly available information (up to 2023) from the Lithuanian Energy Agency, operator reports, and international energy databases. Where exact figures are not disclosed by operators, the entry notes “capacity not published”.
1. Nuclear
| Power station | Location | Reactors (type) | Capacity (MW) | Status |
|---|---|---|---|---|
| Ignalina Nuclear Power Plant (INPP) | Ignalina (Alytus County) | 2 × VVER‑1000 (pressurised‑water) | 2 × 1 500 MW (≈ 3 000 MW) | Decommissioned – Unit 1 shut down 2004, Unit 2 shut down 2009 (final dismantling ongoing) |
2. Thermal / Combined‑Heat‑and‑Power (CHP)
| Power station | City / Region | Primary fuel | Electrical capacity (MW) | Heat capacity (MW th) | Operational status |
|---|---|---|---|---|---|
| Elektrėnai Power Plant (Elektrėnų terminių elektrų kompleksas) | Elektrėnai (Vilnius County) | Coal (with supplemental natural‑gas) | 1 350 MW (≈ 1 100 MW net) | 1 500 MW th | Operating (subject to phase‑out of coal by 2025) |
| Klaipėda Thermal Power Plant (Klaipėdos termofikacinė elektrinė) | Klaipėda | Natural gas (dual‑fuel capability) | 914 MW | 1 600 MW th | Operating |
| Šiauliai Combined Heat and Power Plant | Šiauliai | Natural gas | 72 MW | 120 MW th | Operating |
| Panevėžys Combined Heat and Power Plant | Panevėžys | Natural gas | 35 MW | 80 MW th | Operating |
| Kaunas CHP Plant (Kauno termofikacinė elektrinė) | Kaunas | Natural gas | 165 MW | 300 MW th | Operating |
Note: Smaller auxiliary CHP units (e.g., at industrial parks) exist but are not listed individually because they are not classified as separate “power stations” in national registers.
3. Hydroelectric
| Power station | River | Location | Capacity (MW) | Year commissioned |
|---|---|---|---|---|
| Kaunas Hydroelectric Power Plant (Kauno HPP) | Nemunas | Kaunas | 100 MW | 1960 (upgraded 1994) |
| Kruonis Pumped Storage Plant (Kruono Iššūkių laistymo) – Generation mode | Neris (reservoir) | Kruonis (Joniškis District) | 900 MW (2 × 300 MW + 1 × 300 MW) | 1998 (first unit) |
| Jotvingių (Kreta) Hydro Plant – small run‑of‑river | Šešupė | Jurbarkas | 5 MW | 1995 |
| Additional minor run‑of‑river plants (e.g., Šventoji, Laisvės) each < 5 MW, total ≈ 15 MW | — | — | — | — |
4. Renewable – Wind
Lithuania’s installed wind capacity has risen sharply since 2015 and exceeded 300 MW by the end of 2023, concentrated in three main on‑shore farms and several smaller installations.
| Wind farm | County | Capacity (MW) | Commissioning year |
|---|---|---|---|
| Rietavas Wind Farm | Telšiai County | 71 | 2021 |
| Jurbarkas Wind Farm | Jurbarkas District | 48 | 2020 |
| Pakruojis Wind Farm | Pakruojis District | 39 | 2019 |
| Various small‑scale wind projects (e.g., Šiauliai‑North, Šilutė‑Coastal) | – | ≈ 150 MW combined | 2016‑2023 |
5. Renewable – Solar Photovoltaic (PV)
Solar PV remains a minor but growing share of generation. As of 2023, total utility‑scale solar capacity is about 120 MW, distributed among several solar parks:
| Solar park | Location | Capacity (MW) | Year of operation |
|---|---|---|---|
| Šilutė Solar Park | Šilutė (Klaipėda County) | 45 | 2022 |
| Kaunas South Solar Farm | Kaunas | 30 | 2021 |
| Other distributed PV installations (agricultural‑roof mounts, etc.) | Nationwide | ≈ 45 | 2018‑2023 |
6. Summary of Installed Capacity (approx.)
| Source type | Capacity (MW) |
|---|---|
| Thermal (Coal + Gas) | 2 300 – 2 400 |
| Hydroelectric (including pumped storage) | 1 015 |
| Wind | 300 + |
| Solar PV | 120 + |
| Total net electrical capacity | ≈ 3 800 MW |
Numbers are rounded to the nearest 10 MW and reflect the maximum net generation capability of each plant.
7. Recent Developments & Outlook (2023‑2024)
- Coal phase‑out: The Lithuanian government has set a target to cease coal‑fired generation by 2025, which will require increased reliance on natural‑gas CHP, renewable expansion, and cross‑border electricity imports (via the Nordics and Poland).
- Renewable growth: The 2023‑2024 energy plan forecasts an additional 200 MW of wind capacity and 100 MW of solar PV by 2026, supported by EU recovery funds and national incentives.
- Energy storage: The Kruonis pumped‑storage facility is being modernised to provide frequency‑regulation services and to complement intermittent renewables.
- Grid interconnection: Lithuania continues to develop its Nordic‑Baltic electricity market integration, including the Lithuanian–Polish interconnector (LitPol Link) and participation in the Baltic Ring project.
Sources consulted (publicly accessible up to 2023): Lithuanian Energy Agency annual reports, operator websites (Elektrėnų Energija, Klaipėdos Nafta, Ignalina Nuclear Power Plant decommissioning reports), Eurostat electricity generation statistics, International Renewable Energy Agency (IRENA) country profiles, and the World Bank's “Lithuania – Energy Overview”.