Ethiopia’s electricity generation portfolio consists primarily of hydroelectric facilities, supplemented by emerging wind, solar, geothermal, and thermal power stations. The table below summarizes the major power stations that are documented in reliable encyclopedic sources, noting their type, location, installed capacity, and operational status.
| Power station | Type | Location (Region) | Capacity (MW) | Status |
|---|---|---|---|---|
| Grand Ethiopian Renaissance Dam (GERD) | Hydroelectric | Benishangul‑Gumuz (near the Sudan border) | 6,450* (planned) | Under construction (majority of turbines installed as of 2024) |
| Gilgel Gibe I | Hydroelectric | Oromia (Gibe River) | 184 | Operational (since 2004) |
| Gilgel Gibe II | Hydroelectric (underground) | Oromia (Gibe River) | 420 | Operational (since 2010) |
| Gilgel Gibe III | Hydroelectric | Oromia (Gibe River) | 1,870 | Operational (since 2016) |
| Tana Beles | Hydroelectric | Amhara (Tana and Beles rivers) | 460 | Operational (since 2010) |
| Koka Dam | Hydroelectric | Oromia (Koka River) | 160 | Operational (since 1960) |
| Genale Dawa I | Hydroelectric | Somali (Genale Dawa River) | 140 | Operational (since 2014) |
| Genale Dawa III | Hydroelectric | Somali (Genale Dawa River) | 100 (planned) | Under construction |
| Mekelle (Aysha) Thermal | Diesel‑fueled | Tigray (Mekelle) | 70 | Operational |
| Kombolcha Diesel Power Plant | Diesel‑fueled | Amhara (Kombolcha) | 46 | Operational |
| Adama Wind Farm | Wind | Oromia (near Addis Ababa) | 25 | Operational (since 2013) |
| Kombolcha Wind Farm (Kombolcha Renewable Energy Project) | Wind | Amhara (Kombolcha) | 100 | Under construction (expected commissioning 2025) |
| Hawassa (Awasa) Wind Farm | Wind | Southern Nations, Nationalities, and Peoples' Region (SNNPR) | 30 | Operational (since 2021) |
| Aluto‑Langano Geothermal | Geothermal | Oromia (Aluto volcano) | 7.6 | Operational (pilot plant) |
| Corbetti Geothermal | Geothermal | Oromia (Corbetti) | 500 (planned) | Under development |
| Mekelle Solar Power Plant | Solar PV | Tigray (Mekelle) | 1 (pilot) | Operational |
| Kombolcha Solar Park | Solar PV | Amhara (Kombolcha) | 100 (planned) | Under construction |
| Mekelle Biomass Power Plant | Biomass (municipal waste) | Tigray (Mekelle) | 10 | Operational |
* The total installed capacity of the Grand Ethiopian Renaissance Dam will be realized after all 12 turbines are commissioned; current operational capacity (as of 2024) is around 3,300 MW.
Notes
- Capacities are listed as net electrical output (MW) as reported in publicly available encyclopedic references and official Ethiopian Electric Power (EEP) publications.
- “Under construction” indicates that major civil works and/or turbine installation are in progress, with commercial operation expected within the next few years.
- “Planned” denotes projects that have received governmental approval and have defined capacity targets but have not yet commenced major construction.
- Ethiopia continues to develop additional renewable‑energy projects, particularly in wind and solar, in line with its national goal of achieving universal electricity access and reducing reliance on hydro‑dependent generation.
All information reflects data that is verifiable from reputable encyclopedic and governmental sources up to 2024. Where specific details (e.g., exact commissioning dates) are not publicly disclosed, the status is indicated accordingly.