The Kochi Metro is a rapid transit system serving the city of Kochi in Kerala, India. As of March 2024, the operational network consists of Phase 1 (Aluva to Pettah) and the Phase 1A extension (Pettah to Thrippunithura Terminal). The following is a list of stations in sequential order from the northern terminus at Aluva to the southern terminus at Thrippunithura Terminal.
Operational Stations (Phase 1 & Phase 1A)
Line Color: Blue Line
| # | Station Name (English) | Station Name (Malayalam) | Opened | Layout | Notes |
|---|---|---|---|---|---|
| 1 | Aluva | ആലുവ | June 19, 2017 | Elevated | Northern terminus of Phase 1; proximity to Cochin International Airport (dedicated shuttle service available). |
| 2 | Pulinchodu | പുൽവിളങ്ങാട് | June 19, 2017 | Elevated | |
| 3 | Companypady | കമ്പനിപ്പടി | June 19, 2017 | Elevated | |
| 4 | Ambattukavu | അമ്പാട്ടുകാവ് | June 19, 2017 | Elevated | |
| 5 | Muttom | മുട്ടം | June 19, 2017 | Elevated | |
| 6 | Kalamassery | കളമശ്ശേരി | June 19, 2017 | Elevated | Serves Kalamassery industrial area and educational institutions. |
| 7 | Cochin University | കോച്ചിൻ സർവ്വകലാശാല | June 19, 2017 | Elevated | Serves Cochin University of Science and Technology (CUSAT). |
| 8 | Pathadipalam | പത്താടിപ്പലം | June 19, 2017 | Elevated | |
| 9 | Edapally | എടപ്പള്ളി | June 19, 2017 | Elevated | Major interchange junction; proximity to Lulu Mall and Edapally Junction. |
| 10 | Changampuzha Park | ചങ്ങമ്പുഴ പാർക്ക് | June 19, 2017 | Elevated | Named after poet Changampuzha Krishna Pillai. |
| 11 | Palarivattom | പാലാരിവട്ടം | June 19, 2017 | Elevated | Major commercial hub; near Palarivattom Bypass junction. |
| 12 | JLN Stadium | ജെ.എൽ.എൻ സ്റ്റേഡിയം | June 19, 2017 | Elevated | Serves Jawaharlal Nehru International Stadium; planned interchange for Phase 2 (Pink Line). |
| 13 | Kaloor | കളൂര് | June 19, 2017 | Elevated | Major commercial and residential area; near Kaloor Bus Stand. |
| 14 | Town Hall | ടൗൺ ഹാൾ | June 19, 2017 | Elevated | Serves Ernakulam Town Hall and nearby government offices. |
| 15 | M. G. Road | എം.ജി. റോഡ് | June 19, 2017 | Elevated | Central business district; major shopping and commercial spine. |
| 16 | Maharaja's College | മഹാരാജാസ് കോളേജ് | June 19, 2017 | Elevated | Serves Maharaja's College campus and Marine Drive. |
| 17 | Ernakulam South | എറണാകുളം സൗത്ത് | September 3, 2019 | Elevated | Interchange: Direct connectivity to Ernakulam Junction Railway Station (South Station). |
| 18 | Kadavanthra | കടവന്ത്ര | September 3, 2019 | Elevated | Serves Kadavanthra market and residential areas; near GCDA Complex. |
| 19 | Elamkulam | എളങ്കുളം | September 3, 2019 | Elevated | |
| 20 | Vyttila | വെട്ടില | September 3, 2019 | Elevated | Major transit hub; proximity to Vyttila Mobility Hub (KSRTC/Private Bus Terminal). |
| 21 | Thaikoodam | തൈക്കൂടം | September 3, 2019 | Elevated | |
| 22 | Pettah | പേട്ട | September 3, 2019 | Elevated | Former southern terminus of Phase 1. |
| 23 | Vadakkekotta | വടക്കേക്കോട്ട | March 6, 2024 | Elevated | Part of Phase 1A extension. |
| 24 | SN Junction | എസ്എൻ ജങ്ഷൻ | March 6, 2024 | Elevated | Part of Phase 1A extension; serves Sree Narayana Junction. |
| 25 | Thrippunithura Terminal | തൃപ്പൂണിത്തുറ ടെರ್ಮിനൽ | March 6, 2024 | Elevated | Current Southern Terminus; proximity to Thrippunithura Railway Station. |
Planned / Under Construction (Phase 2 - Pink Line)
Corridor: JLN Stadium – Infopark (via Kakkanad) Status: Approved; construction tendering/land acquisition stages reported as of early 2024. Proposed stations (subject to final alignment changes):
- JLN Stadium (Interchange with Blue Line)
- Palarivattom (Interchange with Blue Line - Note: Alignment may utilize existing station or new structure)
- Chembumukku
- Vazhakkala
- Padamughal
- Kakkanad Junction
- Cochin SEZ
- Infopark I
- Infopark II (Terminus)
Key Facts
- Total Operational Stations: 25
- Total Operational Length: ~27.4 km (Phase 1: ~25.6 km + Phase 1A: ~1.8 km)
- Operator: Kochi Metro Rail Limited (KMRL)
- Rolling Stock: Alstom Metropolis (25 trainsets, 3 cars each)
- Track Gauge: Standard Gauge (1,435 mm)
- Electrification: 750 V DC Third Rail
Note: Station names and opening dates are based on official KMRL press releases and Government of Kerala notifications. Phase 2 station list is indicative based on the Detailed Project Report (DPR) and may vary upon final execution.