Linton Lock Hydro is a small-scale hydroelectric power station located at Linton Lock on the River Ouse in North Yorkshire, England. The scheme utilizes the existing weir and lock structure managed by the Canal & River Trust.
Technical Specifications
- Technology: The installation employs two Archimedes screw turbines.
- Installed Capacity: The scheme has a total generating capacity of approximately 100 kW (often cited as 2 x 50 kW screws).
- Annual Generation: Estimated annual electricity generation is approximately 400–500 MWh, depending on hydrological conditions.
- Head: The scheme operates under a low head, typical of river navigation weirs, approximately 2.5 to 3 metres.
Development and Operation The project was developed by JN Bentley Ltd on behalf of the Canal & River Trust (formerly British Waterways). Construction was completed and the station commissioned in 2012. The electricity generated is exported to the national grid, providing revenue for the navigation authority and contributing to UK renewable energy targets.
Environmental and Fish Passage As a requirement of the environmental permit issued by the Environment Agency, the installation includes a dedicated fish pass (a Larinier pass) to facilitate the upstream migration of species such as salmon, trout, and eels. The Archimedes screws are generally considered "fish-friendly" for downstream passage due to their low rotational speed and large water chambers, though screening is installed at the intake.
Context Linton Lock Hydro is representative of a tranche of low-head hydro projects developed on UK inland waterways in the early 2010s, leveraging existing infrastructure (weirs/locks) to minimize civil engineering costs and environmental impact.