Line 9 (Guangzhou Metro) (Chinese: 广州地铁9号线; pinyin: Guǎngzhōu Dìtiě Jiǔ Hào Xiàn), also referred to as the Huadu Line (花都线), is an east–west rapid transit line of the Guangzhou Metro system in Guangdong Province, China. It runs primarily through Huadu District and terminates in Baiyun District, connecting the Huadu central urban area, the Huadu automotive industrial base, Guangzhou North Railway Station, and—via an interchange with Line 3—the broader city network and Baiyun International Airport.
Overview
The line is operated by Guangzhou Metro Corporation and owned by the Guangzhou Metro Group. It is approximately 20.1 km (12.5 mi) long and comprises 11 stations, all underground. Its route roughly forms a "几"-shaped east–west alignment. The line's designated colour is pale green (described in some sources as mint green).
Line 9 opened for operation on 28 December 2017. At opening, trains did not stop at Qingtang station, which was a later infill addition; Qingtang entered service on 30 June 2018. The line is fully underground except for the Qishan Depot.
Route and stations
The line runs from Fei'eling (飞鹅岭) in the west to Gaozeng (高增) in the east. Stations, in order, are:
Fei'eling (飞鹅岭) – Huadu Autocity (花都汽车城) – Guangzhou North Railway Station (广州北站) – Huachenglu (花城路) – Huaguoshan Park (花果山公园) – Huadu Square (花都广场) – Ma'anshan Park (马鞍山公园) – Liantang (莲塘) – Qingbu (清㘵) – Qingtang (清塘) – Gaozeng (高增)
Currently, the only operational interchange is at Gaozeng with Line 3. Some sources also refer to Line 9 as the "Huadu Line" because it was the first metro line serving Huadu District. Future interchanges are planned or under construction at Ma'anshan Park (with Line 18) and Guangzhou North Railway Station (with Line 24).
Technical characteristics
Line 9 uses six-car Type B trains, designated internally as B6, with a designed maximum speed of 120 km/h and an operating speed reported at approximately 95 km/h (travel speed figures of about 55 km/h are also cited). Traction power is supplied via overhead lines at 1,500 V DC, and the signalling system is CBTC. The first train was manufactured by CRRC Zhuzhou, with subsequent units assembled locally by Guangzhou CRRC Rail Transit Equipment. The rolling stock was among the first in the Guangzhou Metro fleet to feature LCD dynamic route-map displays in passenger cars.
Construction was notable for difficult geological conditions: the line is frequently described in Chinese sources as the first underground line in mainland China built entirely through water-rich karst terrain, and the first mainland metro line to cross beneath a 350 km/h high-speed railway embankment (in the section beneath the Wuhan–Guangzhou High-Speed Railway and the Beijing–Guangzhou Railway). The project received a China Civil Engineering Zhan Tianyou Award.
Ridership and planning
Reported daily average ridership was approximately 116,200 passengers in 2024 and about 111,800 in 2025. A westward extension of about 4.8 km from Fei'eling to a planned Forest Park station in Tanbu town has been proposed, with longer-term planning documents indicating further southwestward extension toward an interchange with the Guangfo West Ring intercity railway. Earlier proposals to extend the line to Qingyuan were not implemented; that connection is instead served by the Guangzhou–Qingyuan intercity railway.
Assessment
Line 9 is a documented, established component of the Guangzhou Metro network and is covered by reliable encyclopedic and transit sources. Details such as total length and station count vary slightly among sources (for example, differing figures of 19.21 km and 20.1 km appear in English- and Chinese-language references), reflecting differing measurement conventions or revision dates.