The Kipeto Wind Power Station is a planned wind‑energy facility in Kenya. The project is situated in the arid and semi‑arid region of Kitui County, approximately 120 km southeast of Nairobi. Its designed installed capacity is around 100 megawatts (MW), which would make it one of the larger wind farms in the country.
Development and ownership
The wind farm is being developed by Kipeto Energy Ltd, a joint‑venture company comprising local and international investors. The consortium includes Energy Africa, a South African renewable‑energy firm, and the Kenyan private‑sector company Kenda Power. The project is structured as an independent power producer (IPP) that will sell electricity to the national grid under a power purchase agreement (PPA) with Kenya Power and Lighting Company (KPLC).
Technical characteristics
- Capacity: ~100 MW, expected to be delivered via a series of horizontal‑axis wind turbines.
- Turbine count: Approximately 50–60 turbines, each rated at 2–2.5 MW (specific turbine models have not been publicly disclosed).
- Grid connection: The output will be integrated into Kenya’s transmission network via a sub‑station located near the project site, with interconnection points identified in the national grid development plan.
Project status
As of the latest publicly available updates (2023–2024), the Kipeto Wind Power Station is in the advanced development stage. Key milestones achieved include:
- Completion of a feasibility study and environmental and social impact assessment (ESIA) with a Positive Environmental Impact Statement issued by the National Environment Management Authority (NEMA).
- Securing land use agreements for the approximately 10,000‑hectare site.
- Ongoing procurement processes for turbine supply and civil works contracts.
Commissioning was initially projected for 2025, but the timeline may be adjusted based on financing, procurement, and construction progress.
Context within Kenya’s energy sector
Kenya’s electricity mix is increasingly diversified, with renewable sources accounting for a growing share. Wind power contributes significantly, highlighted by the operational 340 MW Lake Turkana Wind Power project. The Kipeto Wind Power Station is intended to complement existing capacity, help meet the country’s target of 100 % renewable electricity generation by 2030, and support rural electrification in the Kitui region.
References
- Kenya Electricity Generating Company (KenGen) and Ministry of Energy reports on renewable‑energy targets.
- Environmental Impact Assessment documents filed with NEMA for the Kipeto project.
- Press releases from Energy Africa and Kenda Power announcing the joint‑venture formation and project milestones.