Kemper Project

The Kemper Project, also known as the Kemper County energy facility or Plant Ratcliffe, is a natural gas-fired electrical generating station located in Kemper County, Mississippi, United States. It was built by Mississippi Power, a subsidiary of Southern Company, which began construction in 2010. The project is notable for its original intended purpose: it was designed to be a coal-fired integrated gasification combined cycle (IGCC) facility that would employ "clean coal" technologies, including carbon capture and sequestration, making it a centerpiece of early efforts to demonstrate carbon capture on a commercial scale in the United States.

Background and Original Design

Kemper County, a small county in eastern Mississippi roughly 30 miles north of Meridian, was selected as the plant's site partly to take advantage of locally available lignite (brown coal), an untapped natural resource in the state. The project was intended to use "transport integrated gasification" (TRIG) technology, developed collaboratively by the U.S. Department of Energy, Southern Company, and KBR at the Power Systems Development Facility in Wilsonville, Alabama. TRIG converts lignite into synthetic gas (syngas) that would be used to power turbines for electricity generation.

The design further incorporated carbon capture and sequestration (CCS), with plans to capture approximately 65 percent of the carbon dioxide emissions and transport them via pipeline for use in enhanced oil recovery at neighboring oil fields in Mississippi. Had the coal-fired facility succeeded, it would have been the first commercial-scale "clean coal" plant in the United States and the second TRIG facility in the country.

Construction and Cost Overruns

The project was certified by the Mississippi Public Service Commission and groundbreaking occurred on June 3, 2010. It was originally scheduled to enter service by May 2014 at a projected cost of approximately $2.4 billion. However, the project experienced recurring delays and substantial cost escalation. By June 2017, the plant was still not in service and its cost had risen to approximately $7.5 billion, making it, according to a Sierra Club analysis, the most expensive power plant ever built based on its generating capacity.

Milestones during construction included the first firing of combustion turbines in 2013, first fire of the gasifiers in March 2015, and production of syngas and electricity using syngas during 2016. However, technical problems, including leaks discovered in March 2017, persisted.

Abandonment of Coal Gasification

In June 2017, due to ongoing technical difficulties and escalating costs, Southern Company and Mississippi Power announced that the plant would operate burning natural gas only, abandoning the coal gasification approach. The gasification structure was ultimately demolished in October 2021. The plant operates as a natural gas–fired combined cycle facility with a nameplate capacity of approximately 582 megawatts.

Legal and Political Controversies

The project generated significant legal and political controversy. In February 2015, the Mississippi Supreme Court ruled that Mississippi Power must refund ratepayers for rate increases related to the project, which had been permitted under Mississippi's Baseload Act (legislation that allowed utilities to charge consumers for power plants under construction). In May 2016, Southern Company and Mississippi Power disclosed that they were being investigated by the U.S. Securities and Exchange Commission regarding cost overruns. The company was also involved in litigation over a cancelled carbon dioxide off-take contract and was found to have unlawfully fired a whistleblower.

Politically, the project drew support from figures including then-Governor Haley Barbour and former Speaker of the House Newt Gingrich, and it received roughly $270 million in U.S. Department of Energy funding. Environmental organizations such as the Sierra Club opposed the project, arguing that it was expensive and provided limited environmental benefits.

Environmental Aspects

The facility was designed as a "zero liquid discharge" facility, using treated municipal wastewater from Meridian as its only water source and releasing no processed water into local rivers or streams. Mitigation efforts included the enhancement of wetlands, riparian buffers, and stream channels.

Outcome

The Kemper Project is widely regarded as a cautionary example in energy policy debates, illustrating the technical and economic challenges of commercial-scale coal gasification and carbon capture. Its plans for "clean coal" generation were abandoned in July 2017, and the plant continues in operation as a natural gas–fired generating station.