The Jordan River Dam, officially known as the Jordan River Diversion Dam and referred to locally simply as the Diversion Dam, is a hydroelectric dam on the Jordan River in Jordan River, British Columbia, Canada. It is part of a multi-dam hydroelectric system operated by BC Hydro and provides approximately 35% of Vancouver Island's generating capacity.
Overview
The dam impounds the Jordan River on Vancouver Island, roughly 72 kilometers west of Victoria, British Columbia. It is a concrete buttress dam approximately 38.4 meters (126 feet) high. The dam's impoundment, the Jordan River Diversion Reservoir, has a surface area of about 18 square kilometers and a licensed storage capacity of approximately 20.5 million cubic meters. It was the second hydroelectric development on Vancouver Island, following the earlier Goldstream Powerhouse.
History
Construction and early years (1909–1912)
The dam was constructed between 1909 and 1912 by the Vancouver Island Power Company, a subsidiary of the British Columbia Electric Railway. Upon completion, the Diversion Dam was the highest dam in Canada at 126 feet in height. Water was conveyed from the dam through a flume approximately 9.6 kilometers (31,600 feet) long to a penstock feeding the power house below. Because of the facility's remote location, a narrow-gauge railway and a cable railway were built to support construction and access.
Between 1912 and 1931, successive upgrades and additional generators increased the power house's capacity to 26 megawatts.
Modernisation (1971)
In 1971, the original flume was replaced by a roughly 7-kilometer tunnel, with a penstock feeding a new power house built across the river from the original site. A single high-head Francis turbine and generator manufactured by Fuji Electric replaced the earlier equipment, increasing output from 26 megawatts to between 175 and 183 megawatts. The original service railway was dismantled in the same year.
System description
The Jordan River hydroelectric system comprises several interconnected components. Water is collected at Bear Creek Dam and the Diversion Dam, feeding the Jordan River Diversion Reservoir. From there, the smaller Jack Elliott equalization reservoir regulates flow into an 8.8-kilometer tunnel. Water then drops through a steel penstock over the final 101 meters of vertical head before reaching the turbine at the generating station near the river mouth.
Seismic hazard and community impact
A 2014 BC Hydro study concluded that the Jordan River Dam faces the highest seismic hazard in the BC Hydro system. It was determined that a magnitude 8–9 Cascadia subduction zone earthquake could potentially cause the dam to collapse, sending a flood wave downstream into the Jordan River village. BC Hydro identified several homes within the potential evacuation zone and negotiated property buyouts for at-risk homeowners. The village had previously been largely vacated following the assessment.
Indigenous relations
The Jordan River system lies on the unceded traditional territory of the Pacheedaht First Nation. In June 2018, BC Hydro and the Pacheedaht First Nation agreed to transfer approximately 28 hectares of the Jordan River "origin site" back to the Nation. The transfer was described as a historic repatriation of traditional lands.
Ecology and water use planning
The Jordan River historically supported runs of pink, chum, and coho salmon, as well as steelhead and sea-run coastal cutthroat trout. In 2001, a Water Use Planning process was initiated for the river, identifying a legacy copper mine in the lower watershed as a barrier to salmon recovery. Management measures have included maintaining minimum flows for resident trout and creating wetland habitat in the reservoir drawdown zone.
References
- Wikipedia: "Jordan River Dam" — https://en.wikipedia.org/wiki/Jordan_River_Dam
- "Jordan River Water Use Plan Consultative Committee Report," BC Hydro, 2002
- BC Hydro seismic hazard documentation for the Jordan River facility