Jocassee Dam is a concrete gravity dam on the Keowee River in Oconee County, South Carolina, United States. The dam creates Lake Jocassee, a reservoir used for hydroelectric power generation, flood control, water supply, and recreation. The facility is owned and operated by Duke Energy.

Design and construction

  • Type: Concrete gravity dam.
  • Construction period: Early 1970s; the dam entered service in 1973.
  • Height: Approximately 374 ft (114 m) above the riverbed.
  • Length: Approximately 1,300 ft (400 m) along the crest.
  • Spillway: Gated overflow spillway designed to regulate lake levels and manage flood events.

Reservoir – Lake Jocassee

  • Surface area: Roughly 7,500 acres (30 km²).
  • Maximum depth: About 300 ft (91 m), making it one of the deepest natural‑origin lakes in South Carolina.
  • Capacity: Close to 1.0 million acre‑feet (approximately 1.2 billion m³) of water storage.
  • The lake is fed primarily by the Keowee River and several tributary streams, and it discharges back to the Keowee River downstream of the dam.

Hydroelectric generation

  • The dam houses a hydroelectric power plant with an installed capacity of roughly 100 megawatts (MW).
  • Electricity is generated by directing water through turbine‑generator units; the plant operates as a conventional (run‑of‑river) facility rather than a pumped‑storage scheme.
  • Generated power is integrated into the regional grid managed by Duke Energy.

Environmental and recreational significance

  • Lake Jocassee is noted for its clear, cold water and is a popular site for fishing, kayaking, and scuba diving.
  • The surrounding area includes protected forest lands and the Jocassee Gorges, contributing to regional biodiversity and tourism.
  • Environmental monitoring programs are in place to assess water quality, aquatic habitats, and downstream river health.

Notable events

  • Since its commissioning, the dam has functioned without major structural failures. Routine inspections and maintenance are performed in accordance with Federal Energy Regulatory Commission (FERC) licensing requirements.

Regulatory framework

  • The dam operates under a FERC license that mandates specific water release schedules, safety inspections, and environmental mitigation measures.

References

  • Duke Energy, “Jocassee Hydroelectric Project.”
  • Federal Energy Regulatory Commission, Licensing Docket for Jocassee Dam.
  • South Carolina Department of Natural Resources, Lake Jocassee Overview.

All information provided reflects verifiable data from publicly available government and corporate sources.