The Jasper Ocean Terminal (JOT) is a planned deepwater container port to be built in South Carolina on the Savannah River, approximately 10 miles (16 km) downstream from Savannah, Georgia. It is a joint development project involving the Georgia Ports Authority and South Carolina authorities, intended to expand container-handling capacity for the region.
History and development
The project has been in various stages of planning since 2007. In 2008, the Georgia Ports Authority (GPA) and the South Carolina Ports Authority (SCPA) signed an early agreement to jointly build and operate the facility. Progress was slowed by political tensions regarding plans to dredge the river, and by 2016 only about $10 million had been spent on planning and permits. In November 2015, the two port authorities signed an updated agreement to proceed, and in late 2016 a new round of design work began with an estimated cost of $100 million. In January 2017, the U.S. Army Corps of Engineers began the environmental impact statement for the dockside portion of the terminal.
In 2021, the South Carolina Ports Authority transferred its half-interest in the 1,500-acre property to Jasper County, citing differing market priorities as the main reason for withdrawing from the joint venture. The Georgia Ports Authority retained its share of the site.
Planned specifications
At full build-out, the Jasper Ocean Terminal is projected to cover 1,500 acres with ten berths. It would be dredged to a depth of 55 feet (17 m), capable of accommodating container ships carrying as many as 20,000 twenty-foot equivalent units (TEUs), with an annual capacity of approximately seven million TEUs. Planned access includes a new four-lane highway connecting to U.S. Route 17, along with rail connections to both CSX Transportation and Norfolk Southern Railway lines.
Cost and timeline
The total estimated cost of constructing the port is approximately $4.5 billion. The terminal is currently planned to open between 2035 and 2037. As of recent reports, the project's construction timeline and funding remain subject to ongoing approvals and agreements between the involved parties.
References
- "Haley urges funding for S.C.-Ga. port project." The Post and Courier, May 1, 2016.
- "Charleston port officials: Jasper terminal 'long-term answer' for SC, Ga." The Post & Courier, September 30, 2018.
- "Plans for joint Georgia-S.C. container port move forward." Workboat, January 20, 2017.
- "Deal to help launch $4.5B Jasper port project S.C., Ga. sign updated terms for 1,500-acre site." The Post and Courier, November 15, 2015.
- "Jasper Ocean Terminal plans on fast track." Business in Savannah, May 2, 2016.