The January 25–27, 2011 nor'easter was a significant winter storm that affected the Mid-Atlantic and Northeastern United States. It occurred approximately one week before the larger and more historic Groundhog Day blizzard of January 31 – February 2, 2011.
Meteorological History The system originated as an area of low pressure over the Gulf of Mexico on January 24. It tracked northeastward across the southeastern United States, emerging off the Carolina coast on January 25. The low pressure system then underwent cyclogenesis while moving parallel to the East Coast, passing near the benchmark (40°N, 70°W) south of New England on January 26 before moving into the Canadian Maritimes on January 27.
Impacts
- Snowfall: The storm produced a swath of heavy snowfall from the central Appalachians through southern New England. Highest accumulations generally ranged from 12 to 20 inches (30 to 51 cm) in interior portions of Pennsylvania, New Jersey, New York, and Connecticut. Notable maxima included 20.5 inches (52 cm) in East Windsor, Connecticut, and 19.0 inches (48 cm) in Newark, New Jersey. New York City's Central Park recorded 9.1 inches (23 cm), while Philadelphia received 6.7 inches (17 cm).
- Ice and Mixing: Across southern Pennsylvania, central New Jersey, and Long Island, a period of sleet and freezing rain mixed with snow, reducing total snow accumulations but creating hazardous glazing conditions.
- Wind: The storm generated strong northeasterly winds, with gusts exceeding 40 mph (65 km/h) along coastal areas, leading to blowing and drifting snow and minor coastal flooding.
- Travel and Infrastructure: The storm caused widespread travel disruptions, including the cancellation of hundreds of flights at major hubs such as Newark Liberty, LaGuardia, JFK, and Philadelphia International Airports. Rail services, including Amtrak and regional commuter lines, experienced significant delays or suspensions. Numerous school districts and government offices in the affected region closed on January 26 and, in some cases, January 27.
Aftermath and Context The storm contributed to an exceptionally snowy January 2011 for the Northeast corridor. Because it occurred just days before the Groundhog Day blizzard, snow removal resources were strained, and snowpack from this event was still present on the ground when the subsequent storm arrived, exacerbating impacts in the tri-state area.