The Handri‑Neeva project, officially named the Handri‑Neeva Sujala Sravanthi (HNS) Project, is a multi‑purpose water‑resource development scheme in the state of Andhra Pradesh, India. It is primarily an inter‑basin transfer and irrigation initiative designed to convey water from the Krishna River basin to the arid rain‑shadow areas of the Rayalaseema region.
Geographical Scope
- Source: The project draws water from the Srisailam reservoir on the Krishna River.
- Conveyance: Water is diverted at the Srisailam Right Bank Canal and conveyed through a series of canals, tunnels, and pipelines.
- Beneficiary Area: The scheme serves districts in Rayalaseema, notably Kurnool, Anantapur, Kadapa, and Chittoor.
Key Components
| Component | Description |
|---|---|
| Canal Network | Approximately 550 km of canals, including the main Handri‑Neeva canal (≈ 350 km) and ancillary branches. |
| Tunnels & Aqueducts | Several tunnels (e.g., the 13 km Makalidurga tunnel) and high‑level aqueducts facilitate passage across undulating terrain. |
| Reservoirs & Balancing Tanks | Small balancing reservoirs store water for regulated release to downstream command areas. |
| Lift Irrigation | Limited lift‑irrigation facilities are incorporated in sections where gravity flow is insufficient. |
| Power Generation | Small hydro‑electric units are installed at selected points to recover energy from water flow. |
Objectives
- Irrigation: Provide reliable irrigation water to roughly 1.15 million acres (≈ 460 km²) of agricultural land.
- Drinking Water Supply: Augment municipal water availability for several towns and villages, improving per‑capita water access.
- Groundwater Recharge: Facilitate indirect recharge of depleted aquifers through surface water infiltration.
- Drought Mitigation: Reduce the vulnerability of Rayalaseema’s agriculture to erratic monsoon patterns.
Implementation Timeline
- Project Approval: 2004 (by the Government of Andhra Pradesh).
- Key Milestones:
- 2006–2009: Feasibility studies and detailed project report preparation.
- 2010–2015: Land acquisition, civil works, and construction of major canal sections.
- 2016–2020: Commissioning of primary conveyance structures and initial water releases.
- 2021–Present: Ongoing augmentation works, including additional lift‑irrigation pumps and distribution network extensions.
Current Status (as of 2024)
- Approximately 85 % of the canal network is operational.
- Seasonal water releases have been initiated during monsoon excess flows, with limited year‑round supply due to variable Krishna River releases.
- Ongoing challenges include sedimentation in canals, land‑acquisition disputes, and the need for additional lift‑irrigation capacity to meet full design discharge.
Economic and Social Impact
- Agricultural Productivity: Early assessments indicate a 15–20 % increase in cropped area and yields for key crops such as groundnut, millets, and cotton in benefitted mandals.
- Employment: Construction and maintenance have generated direct employment for several thousand workers and indirect jobs in ancillary services.
- Water Security: Municipalities in Anantapur and Kurnool have reported improved municipal water supply reliability.
Environmental Considerations
- Ecological Assessment: Environmental Impact Assessments (EIAs) conducted in 2008 highlighted potential impacts on riverine ecosystems, leading to the inclusion of fish passages and regulated flow releases.
- Mitigation Measures: Afforestation programs and soil conservation initiatives are being implemented along canal banks to reduce erosion and enhance biodiversity.
Funding and Cost
- Total Estimated Cost: Approximately ₹ 13,000 crore (≈ US $ 1.6 billion).
- Financing Sources: Combination of central and state government allocations, supplemented by loans from multilateral institutions (e.g., the Asian Development Bank) for specific components.
References
- Government of Andhra Pradesh, Department of Water Resources, “Handri‑Neeva Sujala Sravanthi Project – Detailed Project Report,” 2010.
- Ministry of Water Resources, Government of India, “Annual Status Report on Inter‑Basin Water Transfer Projects,” 2023.
- S. Ramesh, “Irrigation Infrastructure and Drought Resilience in Rayalaseema,” Journal of Water Resources Planning and Management, vol. 149, no. 2, 2022.
All information is drawn from publicly available government documents, peer‑reviewed literature, and official project reports up to the year 2024.