Goyder South Wind Farm is an operating onshore wind farm near Burra, South Australia. It is the first stage of Neoen's larger Goyder Renewables Zone development, located on the hills south-east of the town of Burra. With a nameplate capacity of 412 MW, it is the largest wind farm in South Australia and the largest in Neoen's global portfolio.
Project Details
The wind farm comprises 75 GE 5.5-158 Cypress wind turbines, each with a rotor diameter of 158 metres (518 ft). A new transmission line connects the facility to the Robertstown substation. Early construction began in December 2021, first power was generated in April 2024, and the facility reached full operational capacity in late 2025.
Background
Goyder South Wind Farm replaced the earlier-proposed 119 MW Stony Gap Wind Farm, initially developed by EnergyAustralia, which sold the project to Palisade Investment Partners in 2017. Neoen acquired the proposal in September 2019 and incorporated it into the larger Goyder Renewables Zone plan.
Power Purchase Agreements
- The Government of the Australian Capital Territory signed a 14-year contract for 100 MW of electricity from the first phase of Stage 1.
- BHP signed a 70 MW baseload renewables contract for Phase 2 to power its Olympic Dam mine. Neoen's 238.5 MW / 477 MWh Blyth Battery in South Australia balances power for the mine.
Ownership
The project is owned by Neoen, a French renewable energy company. The construction contract was awarded to a consortium of GE Renewable Energy and Elecnor. In 2024, the Goyder wind farm(s) were sold to Brookfield.
Environmental and Community Contributions
In 2023, Neoen donated 1,000 hectares at World's End Gorge to the South Australian government, facilitating the creation of a new national park along with the Hopkins Creek Conservation Park on Ngadjuri country.
Related Developments
The 600 MW Goyder North wind farm, with a 226 MW / 866 MWh battery, is planned north of the Goyder Highway. Construction of that battery commenced in late 2025.
Specifications
| Attribute | Detail |
|---|---|
| Country | Australia |
| Location | Near Burra, South Australia |
| Coordinates | 33°45′S 138°55′E |
| Owner | Neoen (sold to Brookfield in 2024) |
| Type | Onshore |
| Turbines | 75 × GE 5.5-158 Cypress |
| Rotor diameter | 158 m (518 ft) |
| Nameplate capacity | 412 MW |
| Website | goyderenergy.com.au |