Four Corners Generating Station

Four Corners Generating Station is a coal-fired power plant located on the Navajo Nation in Fruitland, New Mexico, United States, approximately 25 miles west of Farmington. It is one of the largest generating stations of its kind in the country and a significant source of electricity for the Southwest region.

Ownership and Operation As of 2024, the plant is operated by Arizona Public Service Company (APS), which holds a majority ownership stake. The remaining ownership shares are held by several other utilities, including Salt River Project (SRP), Tucson Electric Power (TEP), PNM Resources (PNM), and El Paso Electric Company. Historically, Southern California Edison (SCE) was a part-owner but sold its shares to APS in 2012.

Generating Capacity The station originally consisted of five generating units. Units 1, 2, and 3 were retired between 2012 and 2013 as part of environmental compliance agreements. As of 2024, the plant operates two units (Units 4 and 5), each with a net generating capacity of approximately 770 megawatts (MW), for a total capacity of roughly 1,540 MW.

Fuel Source The plant burns low-sulfur, sub-bituminous coal supplied primarily from the nearby Navajo Mine, which is owned by the Navajo Transitional Energy Company (NTEC). The coal is delivered to the plant via a dedicated conveyor belt system and rail loop.

Environmental Regulations and Controls Four Corners Generating Station has been the subject of extensive environmental regulation and litigation concerning air quality, visibility in nearby national parks (including Mesa Verde National Park and the Grand Canyon), and water usage.

  • Emissions Controls: To comply with the Clean Air Act and the Regional Haze Rule, the plant’s owners installed Selective Catalytic Reduction (SCR) systems on Units 4 and 5 to reduce nitrogen oxide (NOx) emissions. These controls were completed in 2018.
  • Water Usage: The plant uses water from the San Juan River for cooling and operations. Water rights and usage in the arid Southwest have been ongoing topics of negotiation and management.

Economic and Community Impact The plant and the associated Navajo Mine are major employers in the region, providing hundreds of jobs, a significant portion of which are held by Navajo Nation members. The facility contributes substantial tax revenue and lease payments to the Navajo Nation. However, the plant's operations have also raised long-standing community concerns regarding air quality, public health impacts, and land reclamation.

Future Status In 2022, APS announced a plan to cease coal combustion at Four Corners Generating Station by 2031, accelerating a previous timeline. This decision aligns with APS's clean energy goals and regulatory pressure to reduce carbon emissions. The plan involves the retirement of Units 4 and 5 by the end of 2031, pending regulatory approval. Discussions regarding the economic transition for the local workforce and site reclamation are ongoing among the plant owners, the Navajo Nation, and state regulators.