The Fontainebleau Las Vegas is a hotel and condominium‑style casino resort located on the Las Vegas Strip in Paradise, Nevada, United States. The project, originally announced in 2005, has undergone multiple phases of development, ownership changes, and construction delays.
Site and Planning
- Location: 2545 Russell Road, adjacent to the Mandalay Bay Resort and Casino and the future Resorts World Las Vegas.
- Original Design: Conceived as a luxury resort modeled after the historic Fontainebleau Hotel in Miami Beach, featuring a Frank Gehry‑designed façade and a 73‑story tower (including a 68‑story hotel and a 5‑story casino podium).
Development Timeline
| Year | Event |
|---|---|
| 2005 | Fontainebleau Resorts, LLC announced plans for a $2.9 billion resort. |
| 2007 | Groundbreaking ceremony held; construction began. |
| 2009 | Construction halted due to the 2008 financial crisis and inability to secure additional financing. |
| 2010 | The property entered foreclosure; Lender The Bank of America filed a lawsuit. |
| 2013 | Related Companies, led by Stephen M. Ross, purchased the project’s land and assets for $150 million. |
| 2014–2015 | Renovation and redesign efforts were announced, but the project remained dormant. |
| 2017 | The property was sold to an investor group led by Witkower Group and Alon Management. |
| 2020 | The real estate investment firm The Blackstone Group acquired the unfinished resort for $150 million. |
| 2021 | Blackstone announced plans to complete the resort, rebranding it as The Drew Las Vegas, a partnership with Derek Miller’s Miller Ventures. |
| 2022 | The project was rebranded again to Fontainebleau Las Vegas under the original name, with a revised completion schedule targeting 2025. |
| 2023 | Construction resumed, focusing on structural completion, interior fit‑out, and the installation of mechanical, electrical, and plumbing systems. |
| 2024 | The resort remained under construction, with projected opening dates ranging from 2025 to 2026, depending on market conditions and financing arrangements. |
Ownership and Financing
- Current Owner (as of 2024): Blackstone Real Estate Partners. Blackstone acquired the unfinished structure at a discounted price and has been financing construction through a combination of equity contributions and senior debt facilities.
- Financing Structure: The project’s financing has involved private equity, mezzanine loans, and construction financing from several banking institutions. Specific terms are not publicly disclosed in full, but the overall cost is estimated at approximately $4 billion, reflecting inflation, redesign, and market changes since the original budget.
Planned Features (as publicly disclosed)
- Hotel Rooms: Approximately 4,000 rooms, including standard rooms, suites, and luxury penthouses.
- Casino: A 60,000‑square‑foot gaming floor with slot machines, table games, and a sports betting area.
- Entertainment: A concert venue, multiple nightclubs, and a theater designed to host residencies and live performances.
- Dining: A variety of restaurants and bars, ranging from fine‑dining establishments to casual eateries.
- Convention Space: Over 150,000 square feet of meeting and event space, intended to compete with nearby resort‑based convention facilities.
- Residential Units: A portion of the tower is designated for condominium‑style ownership, offering long‑term investment opportunities.
Design and Architecture
- Architectural Firm: Originally designed by Bergman Hughes with interior design by David Rockwell, later modifications incorporated inputs from Gensler and Gensler’s Las Vegas office.
- Structural Features: The tower's steel framework reaches a height of roughly 735 feet (224 m). The façade incorporates a glass curtain wall system with LED lighting capable of dynamic light shows.
- Sustainability: As of 2024, the project seeks LEED certification for energy efficiency and water conservation, though definitive certification status has not yet been announced.
Status
As of July 2026, construction is ongoing. No definitive opening date has been confirmed, though developers have signaled an intention to open the resort in the 2025–2026 timeframe, contingent on completion of interior fit‑outs, licensing approvals, and market conditions.
References
- Press releases from Blackstone Group (2020‑2024) concerning acquisition and development plans.
- Nevada Gaming Control Board licensing and construction filing records.
- News coverage from reputable sources such as Las Vegas Review‑Journal, Casino Review, and The Wall Street Journal detailing the project's history and financial transactions.