Expressway S2 (Polish: Droga ekspresowa S2) is a controlled-access highway in Poland, serving as the southern section of the partially completed Warsaw Express Ring Road. It has a total length of 34.1 km (21.2 mi) and is maintained by the General Directorate for National Roads and Highways (GDDKiA). The route is part of European route E30.

Route and Location

The expressway runs through the southern part of Warsaw, in the Masovian Voivodeship. It begins at the Konotopa junction west of Warsaw, where it connects to motorway A2 and expressway S8, and ends east of Warsaw, where it rejoins motorway A2. Along its route, it intersects with expressways S8, S79, S7, and S17.

History and Planning

The road was initially planned in the 1970s as part of motorway A2. However, after local Warsaw residents objected to plans for an inner-city motorway, the proposed road was downgraded to an expressway, though the actual route was not changed. Conceptually, it forms one continuous route with motorway A2.

Construction Phases

The western half of the road was constructed in two sections. Work on a 3.9 km stretch between the Warszawa Lotnisko junction (linking to expressway S79) and the Puławska junction began in September 2009. Construction of the other section, 11.1 km long between the western Konotopa junction and Warszawa Lotnisko junction, began in summer 2010. Both sections were originally scheduled for completion by mid-2012 for the Euro 2012 football championships, but this deadline was not met. The S2 was opened in stages beginning in August 2013, with the final part of the western phase up to Puławska junction opening in late September 2013.

The second phase extended the expressway east of Puławska across the Vistula River via the Anna Jagiellon Bridge, connecting to the eastern part of the Warsaw Express Ring Road and the continuation of motorway A2 eastwards. This phase was divided into three contracts:

  • Contract A (4.6 km): Included the tunnel under Ursynów, built by Astaldi S.p.A. at a cost of approximately 1,222 million zł.
  • Contract B (6.45 km): Included a bridge over the Vistula River, built by Gülermak Ağır Sanayi İnşaat ve Taahhüt A.S. and PBDiM Mińsk Maz. at a cost of approximately 757.6 million zł.
  • Contract C (7.45 km): Included overpasses in the Masovian Landscape Park, built by Warbud S.A. at a cost of approximately 561.7 million zł.

The final section, including the Ursynów Tunnel, opened on 20 December 2021.

Ursynów Tunnel (Expressway S2 Tunnel)

The Expressway S2 Tunnel (Polish: Tunel drogi ekspresowej S2 w Warszawie), also known as the Ursynów Tunnel (Tunel pod Ursynowem), is a highway tunnel in Warsaw. Construction began on 1 March 2017 and it opened on 20 December 2021. The tunnel is approximately 2,330–2,335 metres (7,640–7,661 ft) in length, making it the longest road tunnel in Poland as of 2021. It has six lanes and a speed limit of 80 km/h (50 mph). The tunnel runs underneath the pre-existing tunnel of the Warsaw Metro Line M1.

Future Developments

From 2025, average speed measurement devices are planned to be installed on the section between the Wilanów and Lubelska junctions to reduce noise pollution.