Overview
The State of Palestine (comprising the West Bank and the Gaza Strip) does not possess significant indigenous fossil‑fuel resources and therefore relies heavily on imports and limited local generation for its energy needs. The energy sector is administered by the Palestinian Energy and Natural Resources Authority (PENRA), established in 1998, which coordinates electricity supply, renewable‑energy projects, and energy‑efficiency policies under the jurisdiction of the Palestinian National Authority.

Electricity Supply

Region Primary Sources Approximate Share of Supply
West Bank Imported electricity from Israel (≈ 88 %); local diesel‑fuelled power plants (≈ 12 %) 100 %
Gaza Strip Imported electricity from Israel (≈ 120 MWh day⁻¹) and Egypt (≈ 30 MWh day⁻¹); locally operated diesel generators; limited solar installations 100 %
  • The West Bank receives most of its electricity through the Israel Electric Corporation (IEC) under long‑term purchase agreements.
  • The Gaza Strip’s supply is fragmented: electricity from Israel is provided via high‑voltage lines, while a smaller portion is purchased from Egypt. Frequent disruptions result in daily power outages of 8–12 hours.
  • Local diesel generation, operated by private firms and the Palestinian Authority, supplements imported electricity, especially during peak demand or supply interruptions.

Energy Consumption

  • Total electricity consumption (West Bank + Gaza) was estimated at roughly 6–7 TWh per year in the early 2020s, reflecting modest industrial activity and a growing residential sector.
  • Per‑capita electricity use is considerably lower than in neighboring countries, averaging 1,300–1,500 kWh per person per year.

Fuel Imports

  • The Palestinian territories import all fossil fuels required for electricity generation, primarily diesel and heavy fuel oil, which are delivered through Israel and, for Gaza, also via Egypt.

Renewable Energy Development

Initiative Capacity Status
Al‑Basateen Solar Power Plant (West Bank) 10 MW (photovoltaic) Operational since 2018
Gaza Solar Project (Solar water pumps & rooftop PV) ~5 MW (combined) Ongoing pilot installations
Various small‑scale rooftop PV projects < 1 MW total Installed by NGOs and private owners
  • The Palestinian Authority has set a target of generating 10 % of total electricity from renewable sources by 2020, though actual installed capacity remains below this goal due to financial, regulatory, and geopolitical constraints.
  • International donors (e.g., the European Union, United Nations Development Programme) have financed several solar‑energy pilot projects aimed at reducing reliance on diesel generators and improving energy resilience.

Energy Policy and International Cooperation

  • The Palestinian Energy and Natural Resources Authority drafts the national energy strategy, which emphasizes diversification, increased renewable capacity, and energy‑efficiency measures.
  • Bilateral agreements with Israel regulate electricity purchases, while the Inter‑Agency Working Group on Energy (including representatives from the PA, Israel, the World Bank, and UN agencies) addresses infrastructure upgrades and funding mechanisms.
  • The Gaza Strip’s unique political situation limits the implementation of large‑scale projects; however, cross‑border electricity purchases and humanitarian aid sometimes include provisions for temporary fuel supplies.

Challenges

  1. Dependence on Imports – Political and logistical restrictions affect the consistent delivery of fuel and electricity, leading to frequent outages.
  2. Infrastructure Constraints – Aging transmission networks, limited grid capacity, and damage from conflicts hinder reliable distribution.
  3. Financial Limitations – High electricity tariffs, limited fiscal resources, and difficulties accessing international financing impede large‑scale investment.
  4. Regulatory Environment – Overlapping jurisdictions (Palestinian Authority, Israel, Hamas in Gaza) create complex regulatory and operational frameworks.

Outlook
Efforts to expand renewable‑energy capacity, improve grid infrastructure, and secure stable fuel imports continue under the coordination of PENRA and international partners. Achieving energy security for the Palestinian territories remains contingent on both technical investments and the broader political context governing Israeli‑Palestinian relations.