The Elbe Crossing (German: Elbquerung) is a planned fixed transport link across the lower Elbe river between Hamburg and the North Sea, intended to form part of the westward extension of the German coastal motorway Bundesautobahn 20 (A20). It is a joint infrastructure project of the German states of Lower Saxony and Schleswig-Holstein.

Location and Design

The crossing is planned to run between Glückstadt in Schleswig-Holstein (on the north bank of the Elbe) and Drochtersen in Lower Saxony (on the south bank). It is proposed as a twin-tube bored tunnel approximately 6.5 kilometers (4.0 miles) long, with two lanes in each tube and a reduced hard shoulder, connected by around 20 cross passages. If built, it would be the longest underwater road tunnel in Germany and the second-longest road tunnel in the country overall. The tunnel is intended to form part of the so-called "North West Bypass" of Hamburg and to improve road connections along the Amsterdam–Copenhagen transport corridor, allowing the A20 to join Bundesautobahn 26 and continue toward Bremerhaven and the Weser tunnel.

Planning History

  • In May 2002, the Government of Schleswig-Holstein argued for the preferential alignment of the crossing near Glückstadt/Drochtersen.
  • In July 2003, all sections of the A20, including the Elbe crossing, were classified under "urgent need" in the Federal Transport Infrastructure Plan 2003.
  • Route determination by the Federal Ministry of Transport was made in July 2005, followed by a technical feasibility study comparing tunnel and bridge solutions. The study concluded that, owing to difficult ground conditions, a bored tunnel using shield tunneling would be the appropriate design.
  • The building design for the tunnel was approved in December 2008 and June 2009.

Construction and Cost

Construction was originally planned to begin around 2012 but has been repeatedly postponed, with a start date later shifted to 2017 and further reviews undertaken. The construction period is estimated at about six years. Cost estimates have risen over time: approximately €900 million (2008 federal government estimate), €1.1 billion (2012 feasibility study), €1.3 billion (2013 parliamentary debate), and €1.5 billion (2014 report of the Federal Court of Auditors). A feasibility study suggested tolls of around €4.75 for cars and about €25 for large trucks.

Criticism

The project has faced criticism. Some parties, including The Left and Alliance 90/The Greens in Schleswig-Holstein, have argued that the tunnel is expensive and unnecessary, suggesting alternatives such as optimizing the existing Glückstadt–Wischhafen ferry service or strengthening rail connections. Critics have also raised concerns about the tunnel's vulnerability to rising sea levels.

Other Uses of the Term

The term "Elbe crossing" is also used more generally to describe other fixed links or events across the Elbe, including the ElbX electricity tunnel constructed as part of Germany's SuedLink power transmission project (which achieved a tunnel breakthrough in June under a contract for operator TenneT Germany), and the World War II "Elbe Day" (April 25, 1945) marking the first contact between American and Soviet forces on the Elbe near Torgau. However, the primary encyclopedic meaning of "Elbe Crossing" as an established term refers to the planned A20 road tunnel described above.