Eagle P3 is a public–private partnership (P3) involving the Regional Transportation District (RTD) of Denver, Colorado, and Denver Transit Partners, a consortium of private companies. Signed in 2010, the agreement grants Denver Transit Partners a 34-year contract (until 2044) to design, build, finance, operate, and maintain (DBFOM) several RTD commuter rail lines.

Background

Eagle P3 is part of RTD's FasTracks program, a voter-approved public transportation expansion plan funded by a sales tax increase for the Greater Denver metropolitan area. It was the second full transit DBFOM public-private partnership in the United States, following the Tren Urbano in San Juan, Puerto Rico.

Scope

Under the terms of Eagle P3, the private partner is responsible for three commuter rail corridors:

  • A Line (East Corridor) – connecting downtown Denver to Denver International Airport
  • B Line (Northwest Corridor starter segment) – a 5.2-mile (8.4 km) segment to Westminster
  • G Line (Gold Line) – serving Wheat Ridge and communities along the corridor

The contract also includes the construction of a commuter rail maintenance facility and the procurement of 56 commuter rail cars.

Contractual Structure

RTD retains ownership of all assets and collects all revenues generated by the lines, while the private contractor assumes the operational risks. In exchange, RTD makes monthly payments to Denver Transit Partners totaling approximately $7.1 billion over the 34-year contract. The involvement of the private sector was estimated to save about $300 million in construction costs compared to a publicly-led approach.

Selection Process

The selection process began in August 2008 with a request for qualifications. Three companies responded. In June 2010, RTD awarded the contract to Denver Transit Partners, a consortium led by Fluor Corporation and Macquarie Group, with Uberior Infrastructure Investments and Balfour Beatty as major partners. Macquarie Group later sold its stake to John Laing and Uberior at financial closing.

Financing

The total project cost is approximately $2.1 billion, financed through:

  • A federal grant of $1.03 billion (announced August 2011)
  • A federal loan of $280 million (awarded December 2011)
  • $450 million from Denver Transit Partners ($396 million in Private Activity Bonds and $54 million in cash)
  • Local funds from RTD-issued bonds and local government contributions

Construction and Opening

Construction was completed in two phases. Phase 1 began in August 2010 and included the East Corridor, maintenance facility, and the initial segment of the Northwest Corridor. The A Line opened on April 22, 2016. The B Line opened on July 25, 2016, and the G Line opened on April 26, 2019.

Operations

Denver Transit Partners contracts with Denver Transit Operators—a consortium led by Alternate Concepts, with Balfour Beatty and Fluor—to operate and maintain the commuter rail lines. RTD directly operates the later-built N Line but uses the same equipment maintained by Denver Transit Operators.