The Dukovany Nuclear Power Station (Czech: Jaderná elektrárna Dukovany) is a commercial nuclear power plant located near the village of Dukovany in the Vysočina Region of the Czech Republic, approximately 20 km southeast of the town of Třebíč.
Key facts
| Attribute | Details |
|---|---|
| Operator | ČEZ, a Czech electric utility company |
| Owner | Primarily ČEZ, with minority stakes held by various Czech entities |
| Construction start | 1974 |
| Commissioning of first unit | 1 April 1985 |
| Reactor type | Pressurized Water Reactors (PWR) of the VVER‑440/213 design (Soviet‑origin) |
| Number of reactors | Four operational units (Units 1–4) |
| Electrical capacity | Approximately 2 GW (2 000 MW) net |
| Annual generation | Roughly 16–18 TWh (varies by year) |
| Fuel | Low‑enriched uranium dioxide (UO₂) fabricated in domestic Czech fuel fabrication facilities |
| Cooling source | Reservoir created by the Jihlava River and auxiliary cooling towers |
| Safety upgrades | Continuous modernization, including post‑Fukushima enhancements such as additional emergency power supplies and upgraded instrumentation |
| Planned lifespan | Original design life of 30 years, extended through retrofits to at least 2025–2030; discussions about further life extension are ongoing |
Historical overview
- 1970s–1980s: Planning began in the early 1970s as part of Czechoslovakia’s program to increase electricity generation capacity. Construction started in 1974, and the first unit reached commercial operation in 1985.
- 1990s: Following the dissolution of Czechoslovakia, the plant became part of the newly independent Czech Republic’s energy infrastructure. Ownership was transferred to ČEZ, which continues to manage the facility.
- 2000s–present: The plant has undergone multiple safety and efficiency upgrades to meet European Union nuclear safety standards and to improve operational performance. These upgrades have included retrofitting of control systems, replacement of steam generators, and enhancement of seismic and flood protection measures.
Economic and energy significance
- Dukovany supplies roughly 10 % of the Czech Republic’s electricity demand, contributing to the nation’s energy security and reducing reliance on fossil fuels.
- The plant provides a stable base‑load generation source, enabling higher integration of variable renewable energy sources such as wind and solar within the national grid.
Future considerations
- The Czech government and ČEZ are evaluating options for the plant’s long‑term future, including possible further life‑extension measures, the construction of additional units, or de‑commissioning strategies. As of the latest publicly available information, no definitive decision on a new reactor at the Dukovany site has been announced.
References
- ČEZ Group annual reports (various years)
- International Atomic Energy Agency (IAEA) Power Reactor Information System (PRIS) entry for Dukovany NPP
- European Commission reports on nuclear safety in member states
- Czech Ministry of Industry and Trade publications on national energy policy
All data presented reflects information available from publicly released and reputable sources as of 2026.