The Dresden-Klotzsche–Dresden Airport railway is a 2.3-kilometre (1.4 mi) long, double-track, electrified branch line in the German state of Saxony. It connects Dresden Airport (Flughafen Dresden) to the main line network at Dresden-Klotzsche station on the Görlitz–Dresden railway.

History The line was constructed to provide a direct rail link to Dresden Airport, which previously relied solely on road access. Construction began in 1999, and the line was officially opened on 25 March 2001, coinciding with the opening of the new airport terminal. The project included the construction of the airport station (Dresden Flughafen) and a connecting curve to the existing tracks at Dresden-Klotzsche.

Infrastructure The route branches off the Görlitz–Dresden railway south of Dresden-Klotzsche station. It runs largely on an embankment and crosses the federal highway B97 via a bridge before terminating at the underground airport station. The line is electrified with the 15 kV 16.7 Hz AC overhead system used on the German mainline network. It is equipped with the PZB 90 train protection system and is operated as a single-track line for operational purposes despite being built with double-track infrastructure (the second track serves as a siding/passing loop).

Operations The line is served exclusively by the S-Bahn Dresden. Since its opening, it has been served by line S2 (originally S8 until the 2004 timetable change), which runs from Dresden Hauptbahnhof through Dresden-Neustadt and Dresden-Klotzsche to the airport, continuing to Pirna. Trains typically operate at 30-minute intervals. The travel time from Dresden Hauptbahnhof to Dresden Flughafen is approximately 22 minutes. The infrastructure is owned and maintained by DB Netz (now DB InfraGO).

Browse

More topics to explore

    Browse all articles