The Coomera Connector (designated M9), previously known during planning as the Intra Regional Transport Corridor, is a partially completed 45-kilometre (28-mile) motorway in South East Queensland, Australia. It is intended to connect Logan City with the Gold Coast, running parallel to and east of the Pacific Motorway (M1) and adjacent to the Gold Coast railway line south of Coomera. It is sometimes referred to informally as the "Second M1."
Route and Designation
The motorway is planned as a six-lane, state-controlled north-south road corridor between Loganholme (where it will connect to the Pacific Motorway and Logan Motorway) and Nerang (at Nerang–Broadbeach Road). The route number M9 was confirmed in August 2025 alongside the official name.
The project is divided into two main sections:
- Stage 1 (southern section): Approximately 16 km from Nerang to Coomera, further divided into three sub-sections (North, Central, and South).
- Future stages (northern section): Approximately 29 km from Coomera to Loganholme, currently in planning.
Construction and Opening
Construction of Stage 1 commenced in March 2023. The Stage 1 North sub-section—between Shipper Drive at Coomera and Helensvale Road at Helensvale—opened to traffic on 2 December 2025. The remaining sub-sections of Stage 1 (Central and South) are due to open in subsequent years. The northern section from Coomera to Loganholme remains under planning as of late 2025.
Funding
The federal and state Australian governments committed a total of approximately $1.53 billion on a 50:50 basis to plan and construct Stage 1. Media reporting in September 2021 indicated cost estimates for Stage 1 had risen to $2.1 billion, with the Queensland Transport and Main Roads Minister attributing the increase to broader infrastructure boom conditions. The state government committed an additional $11 million for continued planning of future stages.
Purpose
The Coomera Connector is designed to relieve traffic congestion on the Pacific Motorway (M1), improve safety, and provide an alternative north-south transport link for South East Queensland. The corridor was first identified in planning documents from the 1990s and was formally confirmed as a future strategic transport link in a 2015 joint study between the Queensland Department of Transport and Main Roads and the City of Gold Coast.
Key Interchanges (Stage 1, opened or planned)
- Nerang–Broadbeach Road (State Route 90) — southern terminus
- Southport–Nerang Road (State Route 20)
- Smith Street Motorway (State Route 10)
- Gold Coast Highway (State Route 2)
- Helensvale Road — diamond interchange
- Shipper Drive, Coomera — current northern terminus of Stage 1