COMETA (an acronym for COnexión MEditerránea Transporte Alta tensión; also known as the Majorca–Valencia interconnector and the Romulus project) is an undersea high-voltage direct current (HVDC) electric power transmission system linking mainland Spain with the island of Majorca (Mallorca) in the Balearic Islands. The project was developed and is owned by Red Eléctrica de España (REE).

Location

The system connects the Morvedre substation near Valencia on the mainland to the Santa Ponsa substation near Palma de Mallorca on Majorca.

Technical specifications

  • Type: Submarine HVDC cable
  • Total length: 247 km (153 mi) — 240 km submarine and 7 km land cable
  • Power rating: 400 MW total (2 × 200 MW)
  • DC voltage: 250 kV (bipolar)
  • AC voltage: 230 kV
  • Number of poles: 2
  • Maximum cable depth: 1,485 m (4,872 ft)
  • Cable manufacturers: Prysmian Group and Nexans SA
  • Converter stations: Siemens

The system consists of two bipolar HVDC cables, each with a transmission capacity of 200 MW at 250 kV, plus a metallic return cable. At the time of its completion, it was the second longest submarine power cable (after NorNed) and the second deepest (after SAPEI).

History

Contracts between Red Eléctrica and Nexans and Prysmian were signed on 26 September 2007. A contract with Siemens for the two converter stations followed on 9 October 2007. Cable laying began on 13 January 2011 (first cable) and 27 January 2011 (second cable), performed by the cable ships Giulio Verne and Nexans Skagerrak, respectively. Trenching was carried out by the MPSV Edda Fjord and the dredger Argo I.

COMETA became operational in early 2012 at reduced capacity and reached full capacity in August 2012. The total project cost was €375 million. The Spanish grid operator estimated that the connection would generate approximately €25 million per year in savings through more efficient power supply to the islands and reduced carbon emission costs.

Purpose

The project was designed to connect the Balearic Islands' isolated electricity grids with the Spanish peninsular grid, improving the reliability and quality of electrical supply to Majorca and supporting the island's growing energy demand. Plans exist to extend the connection onward to Ibiza and Formentera via a separate 115 km submarine AC cable operating at 132 kV.