CU is the designation of a high-voltage direct current (HVDC) electric power transmission line in the United States, connecting the Coal Creek Station power plant south of Underwood, North Dakota, to the Dickinson converter station near Buffalo, Minnesota.
Overview
The designation "CU" most likely refers to the two Minnesota-based power generation and transmission cooperatives that originally partnered to build the Coal Creek plant and the associated line: Cooperative Power Association and United Power Association. These organizations later merged to form Great River Energy.
Technical specifications
The CU line, which went into service in 1978, can transfer an electrical power of 1,000 megawatts at a symmetrical transmission voltage of 400 kV. The overhead line connection is approximately 436 miles (710 kilometers) long and uses two conductors per pole. Thyristor static inverters are used for the conversion between AC and DC.
Geographic details
The line runs from Coal Creek Station in North Dakota to the Dickinson converter station in Minnesota. Notably, southeast of Wing, North Dakota, the CU line crosses the Square Butte HVDC power line. This is reported to be the only crossing point of two HVDC overhead power lines in the Western Hemisphere.
History and controversy
The CU project generated controversy in 1978 and 1979 as a result of protests by farm landowners along the path of the CU line's right-of-way. Great River Energy later announced that the mine-mouth plant supplying this line, Coal Creek Station, would be decommissioned, leaving the future of the line in question unless another entity acquired and continued operating the plant.
Ground return electrode lines
The ground return electrode line at Coal Creek Station uses the towers of an adjacent AC line for support before reaching its endpoint. Similarly, the electrode line at the Dickinson converter plant runs on the towers of the main line before branching onto a separate four-pole line to its endpoint.