The Broadway Tunnel was a tunnel under Fort Moore Hill in Downtown Los Angeles, California, that operated from 1901 to 1949. It extended North Broadway (formerly Fort Street), at Sand Street (later California Street), one block north of Temple Street, northeast to the intersection of Bellevue Avenue (later Sunset Boulevard, now Cesar Chavez Avenue), to Buena Vista Street (now North Broadway). It was demolished to make way for the Hollywood Freeway (U.S. Route 101).

Location: Los Angeles, California, USA Status: Demolished Route: North Broadway Work began: November 2, 1899 Opened: August 17, 1901 Closed: June 2, 1949 Length: 760 feet (230 m) Width: 40 feet (12 m) Clearance: 22 feet (6.7 m) Lanes: Two Grade: 6 in 100

History

A proposal for opening Broadway through to Buena Vista Street was made as early as February 1891. Plans were prepared by the city engineer's office in early March 1895. The primary argument for construction was that a tunnel providing an additional northern opening would alleviate the dangerous traffic congestion at the corner of First and Spring Streets, which was caused by horses, buggies, and wagons.

Construction

Work began on November 2, 1899, with about 25 men and teams of animals clearing obstructions from the north approach. The tunnel required more than 50,000 cubic yards of earth to be excavated, 4,000 cubic yards of concrete, and 1.25 million bricks for lining. At the time of its completion, the Broadway Tunnel was the widest tunnel of its type in the United States, and possibly the world—with the exception of the tunnel in Fairmount Park in Philadelphia, which was 41 feet in diameter but only 140 feet long. According to the Los Angeles Times, the Third Street Tunnel, which was nearing completion at the same time, could have fit inside the Broadway Tunnel with enough room left for an 8-foot-wide sidewalk.

The Broadway Tunnel opened for traffic on Saturday, August 17, 1901. Its total construction cost was $66,000.

Reconstruction

The tunnel was closed for reconstruction in 1915. The roadway was lowered to reduce the grade, wood block flooring was installed to provide a quieter surface for teams and automobiles, and a false roof was built inside the original shell. A 14-foot cut was made in California Street, and the grade of North Broadway from Temple Street to the tunnel was changed. The concrete archway stood 20 feet high, and the entire bore was lined with white glazed tile. A stairway on the outer face of the southern portal was extended 65 feet to the top of Fort Moore Hill. The tunnel reopened in early February 1916.

Closure and Demolition

The Broadway Tunnel was closed on June 2, 1949, and subsequently demolished for the construction of the Hollywood Freeway (U.S. Route 101) through Downtown Los Angeles. The freeway cut through Fort Moore Hill, necessitating a Broadway overpass to be built across the freeway at the former tunnel site.